Attendees: Rebecca, Eliazar, Elena, Armin, Connor, Eli,
- Upcoming Milestones:
- Retreat on Friday - focus on experiments?
- Â Documents:
- Detectors IRD in progress - maybe look at next time
- Laser PRD - revisit with new laser resources
- Alex?
- Patrick Kramer
- ICD-Lasers - access on working site: https://slac.sharepoint.com/:w:/r/sites/lcls/lcls-2-he/wd/ICD/LCLS-II%20HE%20MFX%20Lasers%20ICD.docx?d=w73e52e9056f94e0cb9df481c8cd63f6d&csf=1&web=1&e=hJLtqF
- Rebecca/Eli
- drawing tree: (link)
- RDS- R2
- update with Det power requirements
- Equipment anchoring BIO review -complete
- stands - complete
- stopper - Jenna - complete
- Controls Coordination - meet up to discuss status
- FXT FDR last week - well done!
- XRT stand naming DONE
- Enclosures added to model
- Rack profile planning ongoing
- timing system?
- each hutch has an ATC crate
- data structure is different for HE - working with data and detectors team
- fast scope? or virtual?
- out of scope items - older vac equipment, cameras, and motors etc. : how is this tracked?
- estimate in progress
- DC power - running by power supply expert on our side
- Endstation scope add estimate: eplan dwg (cosilab) and estimate spreadsheet TBD
- Facilities
- Water Routing
- RDS v2
- meet with Kingston to discuss options for CO2 cooling
- water routing work will be packaged with other facilities work and sent out for bid ~late summer
- RDS v2
- Water Routing
- Detector Coord
- Next Friday - small area detector plan?
- scientist to decide on types, quantities, need for first light
- update PRDs?
- ICD and IRDs in progress
- interface details with detector mover
- Next Friday - small area detector plan?
- Laser coordination
- Patrick working on PRD details (cacls to check if we can meet requirements)
- ICD/PRD/Laser ESD still in progress
- Focus on PRD (working on CXI first)
- Patrick touch base with Alex?
- DxS-MFX transport line is still not finalized
- but it is the preference
- ATM config?
- difference btwn L2Si vers and HE vers?
- we are also ready to design laser out-coupling when laser team has details/requirements available
- Does the detector situation matter? beam tube size? this geometry is important...
- ideal hole diameter?
- what is needed?
- what is common ?
- document on confluence and eventually in PRD
- Resend Z location info to M. Greenberg - help him figure out divergence etc. which will let us know what hole diameter we need...
- thermal issues (see below)
- temp requirements?
- current requirement in RDS: +/-0.5 deg C
- better if laser outside of hutch?
- Radiation safety
- passive shields - Abigail
- photon dump design kicks off this month
- photon dump size for MFX
- it wil be ~ 1mx 1m
- sensor selection - looking for a SME
- ESD in progress with mechanics specified
- photon dump size for MFX
- ray trace
- benchmark cases in progress
- format question for output
- walk through with RP during next meeting(s)
- KB
- hardstops; beam size on photon dump with Matt/Alyssa
- chiller check - rack space - under diag1
- check perimeter (for enclosure) - in model
- Status?