Attendees: Rebecca, Eliazar, Elena, Marc, Abigail, Armin, Elena, Connor


  •  Documents:
  • Equipment anchoring BIO review - in process (Elena)
        • stands - complete
        • stopper - Jenna
        • Documents:
  • Controls Coordination - meet up to discuss status
  • Facilities
      • Meeting on Friday
        • water cooling system
        • ?
      • Water Routing
        • regroup with F&O in January - hutch temp control
        • meet with Kingston to discuss options
        • more temp/humidity loggers
        • add hardware to model
  • Detector Coord
      • Next Friday - small area detector plan?
        • scientist to decide on types, quantities, need for first light
        • update PRDs?
  • Laser coordination
      • Patrick working on PRD details (cacls to check if we can meet requirements)
      • Add monthly meeting back to calendar
      • Engineer: Eli M., Scientist: Patrick Kramer
        • meet up with Joe?
      • ICD/PRD/Laser ESD still in progress
        • Focus on PRD (working on CXI first)
        • Patrick touch base with Alex?
      • DxS-MFX transport line is still not finalized
        • but it is the preference
      • ATM config?
        • difference btwn L2Si vers and HE vers?
      • we are also ready to design laser out-coupling when laser team has details/requirements available
        • Does the detector situation matter? beam tube size? this geometry is important...
        • ideal hole diameter?
        • what is needed?
        • what is common ?
        • document on confluence and eventually in PRD
      • Resend Z location info to M. Greenberg - help him figure out divergence etc. which will let us know what hole diameter we need...
      • thermal issues (see below)
        • temp requirements?
        • current requirement in RDS: +/-0.5 deg C
        • better if laser outside of hutch?
  • Radiation safety
      • photon dump design kicks off this month
        • photon dump size for MFX
          • it wil be ~ 1mx 1m
          • sensor selection - looking for a SME
        • ESD in progress with mechanics specified
      • ray trace
        • data input complete
        • walk through with RP during next meeting(s)
      • KB
        • chiller check - rack space - under diag1
        • check perimeter (for enclosure) - in model
        • Status?
      • IE


  • No labels