Attendees: Rebecca, Eliazar, Elena, Armin, Marc, Vincent


  •  Documents:
  • Controls Coordination - meet up to discuss status
  • Facilities
    • Meeting with Gerald on Thursday
    • Water Routing
      • regroup with F&O in January
      • add hardware to model
  • Detector Coord
    • Meeting last Friday - Jana will attend to discuss documentation - single ICD for all hutches - individual IRDs
    • Walk through with Jana in FEH to look at space for CO2 chillers in Mezzanine (thurs)
      • space still needed while LCLS 1 is running.
  • Laser coordination
    • Add monthly meeting back to calendar
    • Engineer: Alan Mihanari, Scientist: Patrick Kramer
    • ICD/PRD/Laser ESD still in progress
      • Focus on PRD (working on CXI first)
      • Patrick touch base with Alex?
    • DxS-MFX transport line is still not finalized
      • but it is the preference
    • ATM config?
      • difference btwn L2Si vers and HE vers?
    • we are also ready to design laser out-coupling when laser team has details/requirements available
      • Does the detector situation matter? beam tube size? this geometry is important...
      • ideal hole diameter?
      • what is needed?
      • what is common ?
      • document on confluence and eventually in PRD
    • Resend Z location info to M. Greenberg - help him figure out divergence etc. which will let us know what hole diameter we need...
    • thermal issues (see below)
      • temp requirements?
      • current requirement in RDS: +/-0.5 deg C
      • better if laser outside of hutch?
  • Radiation safety
    • photon dump design kicks off this month
      • photon dump size for MFX
        • it wil be ~ 44cmx44cm
      • ESD in progress with mechanics specified
    • ray trace
      • data input complete
      • walk through with RP during next meeting(s)
    • KB
      • chiller check - rack space - under diag1
      • check perimeter (for enclosure) - in model
      • Status?
    • IE