Attendees: Rebecca, Eliazar, Elena, Armin, Marc, Vincent
- Documents:
- Controls ESD - new language - everyone check
- Vincent/ALex/Matt/Maggie update doc?
- Maggie is following up
- Vincent/Antonio/Rebecca - working on estimate for added scope. waiting for vendor (Cosilab) quote (maybe we will have this week)
- Controls IRD in progress - maybe look at next time
- Vac analysis R1 released - check naming convention
- MFX + XPP mega schematic
- Stand naming walkthrough
- Laser PRD - revisit with new laser resources
- Alan Mihanari
- Patrick Kramer
- ICD-Lasers - access on working site: https://slac.sharepoint.com/:w:/r/sites/lcls/lcls-2-he/wd/ICD/LCLS-II%20HE%20MFX%20Lasers%20ICD.docx?d=w73e52e9056f94e0cb9df481c8cd63f6d&csf=1&web=1&e=hJLtqF
- Rebecca
- ICD - controls - complete
- RDS- R1
- drawings added
- Equipment anchoring BIO review - in process (Elena)
- stands - complete
- stopper
- Controls ESD - new language - everyone check
- Controls Coordination - meet up to discuss status
- Photon Stopper - controlled completely by BCS
- timing system?
- each hutch has an ATC crate
- data structure is different for HE - working with data and detectors team
- fast scope? or virtual?
- Antonio working on XRT
- XRT walk-though tomorrow
- Enclosure Box selected - 6Uish from Rittal
- Controls subassemblies almost ready - starting to add enclosures along beamline
- Rack Plan - in good shape
- out of scope items - older vac equipment, cameras, and motors etc. : how is this tracked?
- estimate in progress
- DC power - running by power supply expert on our side
- Endstation scope add estimate: eplan dwg (cosilab) and estimate spreadsheet TBD
- Facilities
- Meeting with Gerald on Thursday
- Water Routing
- regroup with F&O in January
- add hardware to model
- Detector Coord
- Meeting last Friday - Jana will attend to discuss documentation - single ICD for all hutches - individual IRDs
- Walk through with Jana in FEH to look at space for CO2 chillers in Mezzanine (thurs)
- space still needed while LCLS 1 is running.
- Laser coordination
- Add monthly meeting back to calendar
- Engineer: Alan Mihanari, Scientist: Patrick Kramer
- ICD/PRD/Laser ESD still in progress
- Focus on PRD (working on CXI first)
- Patrick touch base with Alex?
- DxS-MFX transport line is still not finalized
- but it is the preference
- ATM config?
- difference btwn L2Si vers and HE vers?
- we are also ready to design laser out-coupling when laser team has details/requirements available
- Does the detector situation matter? beam tube size? this geometry is important...
- ideal hole diameter?
- what is needed?
- what is common ?
- document on confluence and eventually in PRD
- Resend Z location info to M. Greenberg - help him figure out divergence etc. which will let us know what hole diameter we need...
- thermal issues (see below)
- temp requirements?
- current requirement in RDS: +/-0.5 deg C
- better if laser outside of hutch?
- Radiation safety
- photon dump design kicks off this month
- photon dump size for MFX
- it wil be ~ 44cmx44cm
- ESD in progress with mechanics specified
- photon dump size for MFX
- ray trace
- data input complete
- walk through with RP during next meeting(s)
- KB
- chiller check - rack space - under diag1
- check perimeter (for enclosure) - in model
- Status?
- IE
- photon dump design kicks off this month