Attendees: Rebecca, Alyssa, Shanjie, Armin, Eliazar, Eric, Marc
Agenda:
- MFX photon dump sizing
- CXI KB mirror shielding
- Note Status.
- Stopper location in XRT Alcove
- Requirements to consider?
- XRT collimators
Discussion:
- MFX photon dump sizing
- We have a preliminary size based on single pulse damage only but we need to know load from steady state
- sheetrock burnthrough...or should we put layer of something else?
- Concrete wall burnthrough calc for XPP. held up...we need help with assumptions/calc check
- more info needed on KBs: substrate coating, focal length range
- CXI KB mirror shielding
- Note Status.
- Stopper location in XRT Alcove
- Requirements to consider?
- check prefocusing lenses - we are removing. confirm.
- stopped
- XRT collimators
- need upgraded L2Si version (2 locations)
- overall XRT strategy? yiping? david? when?
- air attenuation calculations need to be vetted - by whom??? Ask Yiping who he knows in the community.
- latest study on tunneling through air...
- someone from DESY can help?
- is our gas attenuator going to work?
- HXR atten needs upgrades to get to 2x pressure
- air attenuation calculations need to be vetted - by whom??? Ask Yiping who he knows in the community.