Motor Configuration
Stage | IOC | PV | Cabling | Parameter Manager Config | Status |
---|---|---|---|---|---|
Newport UTS150PPV6 | ioc-mec-ppl-xps2 | MEC:PPL:MMN:13 | Standard Newport connection from mcn-mec-tch2. | OK | |
Micos 6237-C002 Linear Stage, 40mm travel, HV, VSS-42 motor, 16:1 VPGL gear Reference: https://www.pi-usa.us/en/products/precision-motorized-linear-stages | ioc-mec-usrppl-ims | MEC:USR:MMS:25 (formerly XTCS Rotation) | PR60 Patch Panel - DB9 Flange Connection "#4" - Stage. Using cable labeled "RS 422 Rotation Stage". Note: Not connecting DB9 from Micos stage containing limit switch information. | Micos_6237 | PM: We measured the downward and upward motions in response to 5 mm requests. Downward is fine, but upward stops and starts. We recommend cleaning. EG: We don't go to the limits when they are not reliable, we set soft limit 1mm before and after the limits to make sure we don't reach them.I'll be down in the hutch in the afternoon and can have a look at it. UPDATED: Verified working with Eric and Hae Ja 12/09/23. Success was achieved by greasing the drive shaft of the motor and increasing the run current and run current % to 20 for both. This value, while high, allows for the consistent movement of the stage with the added weight of the pushers. |
Micronix VT-50-12316 https://micronixusa.com/product/download/7XReVO/universal-document/xVze6v/VT-50L_Datasheet_v1.5.pdf VT-50L-12316 Motor Type | ioc-mec-usrppl-ims | MEC:TC1:MMS:22 (formerly XTCS Filter Wheel) | PR60 Patch Panel - DB15 Flange Connection "5" - Stage | VT-50-100 | PM: We have verified the cabling for the VT50 out to the cable that comes from the stage. Even when using a VT50 parameter set verified from CXI we saw no motion of the stage.Suggest mechanical inspection. UPDATED: Verified working as of 12/09/23 with Eric and Hae Ja. Solution was using the labelled VT50L cables connected to port 5 on the patch panel. |
Detector Configuration
Detector | DAQ Host | DAQ Configuration | Cabling | Status |
---|---|---|---|---|
Epix10kaQuad0 | daq-mec-pgp02 | -i 0 -P 0x10 -R 0 -D 0x1760 | Host card 0 - (via overhead cable tray) - back of PR60 - PR60 patch panel - Flange - - Detector | OK |
Epix10kaQuad1 | daq-mec-pgp02 | -i 1 -P 0x20 -R 0 -D 0x1760 | Host card 0 - (via overhead cable tray) - back of PR60 - PR60 patch panel - Flange - - Detector | OK |
Epix10kaQuad2 | daq-mec-pgp02 | -i 2 -P 0x11 -R 0 -D 0x1760 | Host card 1- (via overhead cable tray - back of PR60 - PR60 patch panel - Flange - Detector | OK |
Epix10kaQuad3 | daq-mec-pgp02 | -i 3 -P 0x21 -R 0 -D 0x1760 | Host card 0 - (via overhead cable tray) - back of PR60 - PR60 patch panel - Flange - Detector | OK |
| ||||
Epix10ka_1 | daq-mec-cam01 | -i 0 -T -P 0x20 - R 0 - D -x1770 | Host card 0 - R60 E33 RHS patch panel (connection #3) - (via overhead cable tray) back of PR60 - PR60 patch panel - Test Flange - Detector | DAQ/IT issues with high UDP packet oss rates on 10Gb fiber connection to DAQ. |
Von Hamos Configuration
Components:
- Remote (vncviewer) access to Windows PC
Requires Windows machine connected to ICS subnet.Windows PC- Replaced PC with Raspberry Pi
- The Ii is connected to port 13 of stack 8
- The IP address was already set as 172.21.46.200. You can login with username fifteen and password *LCLS*MEC*
- Cable from PC to Controller
- Controller
- Cable from Controller to flange
- Cable from flange to Crystals - in vacuum
- Crystals - in vacuum