Date:
Attendees: Gilliss Dyer Walter Wittmer Ginger DeContreras Mikael David Martinez Pointing stability; getting on the same page with LLNL; working on ops model; alternate flagships for alternate laser
Discussion items
Item | Notes |
---|---|
2nd Petawatt | Draft a technical note. A. Conder suggests that B. Arnold, R. Plummer and C. Rossignol create a draft. KL suggests using framework: https://docs.google.com/spreadsheets/d/1exSima23Ks0vDDqH0QNiwMH0L3CFk1hkNk-wHy5Q30c/edit#gid=0, 5/9/24 update: no progress but welcome. |
RR-SP pointing stability | |
Radiation Source Term | |
Spatial Chirp | Need more information. |
Global Requirements Workshop |
Other
- Mikael provided update on where we are with FES budget exercise.
- Impacts to Science: Single seed laser. One Amica, amplified, split, then normal amplification. Or stacked system. Removed 20' from Laser Hall. Gilliss: DMPL? RR-SP to seed? NNSA possibility could add space.
- No change to TAX
- Impacts to ConOps: Removed both shield walls. No laser shots with people in the Laser Hall. Cavern 258 ft > 169 ft. Removed vestibule. Gilliss: Time to search entire area should be considered. Include in contingency.
Topics for Next Time
- Document Radiation Source Term assumptions
Action items
- LaFortune, Kai Nicholas RR-SP pointing stability - revisit stability budgets and assumptions. (on hold)
- LaFortune, Kai Nicholas Turn slide deck into Engineering Note and publish. (on hold)
- Mikael David Martinez to send LLNL presentation to LaFortune, Kai Nicholas Ginger DeContreras . (on hold)
- Ginger DeContreras to consolidate into TN. (on hold)
- Hardin, Corey L. Put together material for Mikael to brief Mike Dunne by 3/20/2024. Leverage slides/images from Facility Stress Test Workshop (vestibule/beam transport lines on 2nd floor, etc.)