Beam Test 2006 : CERN Operations (CERN emergency number 74444)
This is dedicated to the control room activities
General:
Message Board
3PM Meetings Calendar
Meeting minutes
Phone Numbers
Weekly Shift-list: (PS:
1-2
3
4
)
Schedule
SPS Shift Table
What to do before arriving at CERN
Dates of presence at CERN
Logistics at CERN\
Data Taking:
BT configurations
Instructions for Shifts
What is in the Control Room
Elogbook
Shift Log
Shifters list
Offline Monitor Instructions
Offline Monitor Logbook
Offline Monitor
Geometrical configurations (SPS)
FIFO Configurations
Online
:
Elogbook
Env. Monitoring
Running Run Control
Online Monitoring
Ancillary Detectors
Tagger alignment/synch
Tagger calibration
Offline :
Data Monitoring
Pipeline
Runs Digest
FASTCopy
PS Trigger and DAQ: Computer Network
Trigger Logic
CU Trigger
PS Ancillary Detectors: SSD Chambers Scintillators Calorimeter
Cerenkov
SPS Trigger and DAQ:
External Trigger Logic
SPS Ancillary Detectors:
He Threshold Cherenkov
N2 Threshold Cherenkov
Instrument Procedures: Safety
HV Turn-On
Support Table
PS Procedures: Accelerator
elogbook
Safety Access to T9
Beam and Magnet Settings
SPS Procedures: Safety Access to H4
SPS eLogBook
H4 Manual
SPS live
(
explanation
)
Drawings:
T9 SetUp
CU/ISC-OSC