Readiness checklist

  • All chamber doors must be closed
  • All chamber flanges must be in place (no obvious opening)
  • TC1:VGC:11, TC1:VGC:12, TC1-VGC-01, TC1-VGC-02, TC1-VGC-03, TC1-VGC-04 must be closed
  • MEZ-PMF-01 EBARA A70, MEZ-PMF-02 EBARA A70 must be off (if faulted, press RESET)
  • TC1-VGC-04, MEZ:VGC:17, MEZ:VGC:18, MEZ-VIC-19 must be closed
  • MEZ-GPI-02 must display ~ 6.5e+02 torr (if lower, open MEZ:VGC:18 until restored, then close)
  • TC1-VGC-04, MEZ:VGC:17, MEZ:VGC:18, MEZ-VIC-19 must be closed and allowed to open
  • Turbo pump should be at "Full Speed" (if not follow Turbo pump startup procedure below)

Pumpdown procedure

  • Press OPN on TC1-VGC-04
  • Press RUN on MEZ-PMF-01 EBARA A70
  • Press OPN on MEZ:VGC:17 (wait a few seconds if MEZ:VGC:17 cannot open)
  • Press RUN on MEZ-PMF-02 EBARA A70
  • Press OPN on MEZ-VIC-19 (wait a few seconds if MEZ-VIC-19 cannot open)
  • Wait until MEC:TC1:GPI:01 drops below 5.0e-02 torr
  • Press OPN on TC1-VGC-02
  • Press CLS on MEZ:VGC:17
  • Press STP on MEZ-PMF-01 EBARA A70
  • Press CLS on MEZ-VIC-19
  • Press STP on MEZ-PMF-02 EBARA A70
  • Press OPN on MEZ:VGC:18
  • Wait until MEZ-GPI-02 passes above ~ 6.5e+02 torr
  • Press CLS on MEZ:VGC:18

If something goes off track during this procedure, initiate the venting procedure and check for leaks (flanges, virtual leaks, waterlines, etc).

Turbo pump startup

  • Open mechome, go to the tab "User Devices", open the panel "User Sentry PDU"
  • Turn On "Roughing pump PTM 02 (turbo 2)"
  • Wait until SEW:GPI:04 drops below 1.0e-02 torr
  • Press OPN on SEW-VGC-15
  • Press RUN next to the turbo pump logo
  • Wait until turbo pump displays "Full Speed"

Version tracking

VersionRelease dateDescription
v1.00

 

Demonstration version
v1.01

 

Simplification of the procedure using only checklists