X-Ray Pump Probe

Link to XPP's Confluence page

The XPP Instrument at LCLS

Useful Tips for Tech Support

Hutch Turbos

All turbos that are in frequent use (i.e. Be lens change, mode change, etc.) all have a their power cord unplugged locally and must be manually plugged in/out to pump/vent. Their respective cable is near them at all times.

Roughing Lines

There are only two roughing pumps in the whole hutch, and only one does the heavy lifting. The other is not in use unless the SRD folks need to pump down a section on the end of SB3 or on the GON.


*insert diagram here of roughing lines*

XPP Vacuum System.vsdx.pdf


Nitrogen and Air Supply

The Nitrogen lines can be and often are filled with compressed dry air (CDA). The N2 dewar is located near the roll up dorr