This page is updated on 7/28/2023

LCLS-I (NC) RF Reference Flow in B15


Test Stand Rack Profile: Rack 6


VME CRATE - LCLSI TIMING FANOUT

FEEDTHRU

CPU-B15-SP02

FEEDTHRU




FEEDTHRU/WORKSPACE

                 ATCA CRATE: SHM-B15-SP02-1
Slot 7:
Empty  - Available   
Slot 6: Empty  - Available   
Slot 5: Empty  - Available   
Slot 4: Empty  - Available                             
Slot 3: Empty  - Available                  
Slot 2: LLRF Upconverter        LLRF Down Converter                       
Slot 1:         Switch Blade 10G

FEEDTHRU/WORKSPACE

CPU-B15-RF03

FEEDTHRU/WORKSPACE

                 ATCA CRATE: SHM-B15-RF03-1
Slot 7:
Empty  - Available   
Slot 6: LLRF Upconverter  LLRF DownConverter(SC) (SC-SXR 2856 Mhz PRL)   
Slot 5: LLRF Upconverter  LLRF DownConverter(SC) (SC-HXR 2856 Mhz PRL)
Slot 4: Empty  - Available                             
Slot 3: LLRF Upconverter  LLRF Down Converter(NC) (NC-SXR 2856 Mhz PRL)
Slot 2: LLRF Upconverter  LLRF Down Converter(NC) (NC-HXR 2856 Mhz PRL)                    
Slot 1:         Switch Blade 10G






Test Stand Information (SHM-B15-SP02-1): STCAV2

  • Shelf Manager: shm-b15-sp02-1
  • 10G Eth Switch: cswh-b15-sp02-1
  • Supervisory Controller CPU: cpu-b15-sp02
  • IOCs: sioc-b15-rf99 (slot 3)
    • RF Reference (PRL): 2856 MHz
    • Timing System Pattern: LCLS-II (SC)


Test stand information (SHM-B15-RF03-1): XTCAV2

SHM-B15-RF03-1 Diagram Copy

  • Shelf Manager: shm-b15-rf03-1
  • 10G Eth Switch: cswh-b15-rf03-1
  • Supervisory Controller CPU: cpu-b15-rf03
  • IOCs:
    • sioc-b15-rf11 ==> SLOT 2 ==> NC with PAU (LCLS-I Timing)
    • sioc-b15-rf12 ==> SLOT 3 ==> NC with PAU (LCLS-I Timing)
    • sioc-b15-rf21 ==> SLOT 5 ==> NC with PAU (LCLS-I Timing)
    • sioc-b15-rf22 ==> SLOT 6 ==> NC with PAU (LCLS-I Timing)


Test stand information (SHM-B15-KY01-1): FACET

  • Shelf Manager: shm-b15-ky01-1
  • 10G Eth Switch: cswh-b15-ky01-1
  • Supervisory Controller CPU: cpu-b15-ky01
  • IOCs:
    • sioc-b15-rf13 ==> SLOT 2 ==> FACET RF Stations Test/Troubleshooting and upgrades (LCLS-I Timing)
    • sioc-b15-rf14 ==> SLOT 4 ==> LCLS-1 26-3 RF Station Test/Troubleshooting and upgrades (LCLS-I Timing)


B15 RF Lab Timing Fiber

1. RF Lab Equipment Rack Profile


2. ATCA Timing Fanout


3. LCLS-I Timing Fanout


4. LCLS-II Timing Fanout



Connection diagrams



Reference

1. LCLS-I (NC) RF Reference Flow in B15: LCLS-I_RF_Reference_Flow_In_B15.pptx


  • No labels