Reason for change

The only change is a fix to the calendar code to fix bug: GBW-4@JIRA.

Test Procedure

This version has been tested on the DEV server.

Rollback procedure

Version 0.1.4 could be reinstalled

CCB Jira

SSC-72@JIRA