Documents
HE_PRL_system_FDR-10252023.pptx
Rack Profile and CAPTAR
L2KG07-16.R2.xlsx
L2KG07-49.R2.xlsx
L2KG04-20.R1.xlsx
L2KG10-23.R1.xlsx
phase-reference-line coordinates_HE_07-05-2023_Procurement.xlsx
PRL CAPTAR-L2PRL2.R0.xlsm
LCLS2_HE_LO-panel distribution_08-25-2022.xlsx
Diagrams
LCLSII System Diagram
Meeting Notes
Procurement Tracking
PRL Rigid Line Procurement Tracking.xlsx
Timing_BOE_HE-10252023.xlsx
PCBs
PC_261_100_94_CXX
Chassis
Beckhoff
Power Amplifiers
Change of Baseline:
- Modify the Variable Attenuator PCB
- New PCB status
- Long term measurement in the lab
2. Improve the isolation between splitted channels in MO-LO Gen
3. Improve the power supply for the MO-LO Gen
4. Add PRL diagnostic tool