Agenda: 
- HPS Protection Collimator: Thickness of tungsten? Will the tungsten jaws survive 1 sec of 200 namp beam? Fast beam shutdown system in the silicon detector interlocks?)
- "Hovanes needs a spec for SVT Mover and Wire scanner and I told him I could put together something for the slow-control meeting on April 2 (Wed). I would like to show some slides at the beamline meeting next Monday so that I get feedback. - Takashi"
- Other?
  • No labels