You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 10 Next »

Test Run SVT Group C Setup

Group C SVT test setup

HPS 2014 SVT Group C Setup

All operations are from hpstracker in group C. 

Operation

!!! Remember to turn the fan on the FEB. !!!

Turn on the power to the FEB  

Instructions on how to power the FEB using MPOD with EPICS

FEB Power using Keithley: AVDDP: 5.5V, AVDDN: 5.5V, DVDD: 5.5V and flange power 5.5V (parallel to DVDD).

 

Take a calibration run with expert SVT GUI

Start the DAQ:

$ cd /u1/software/software_new

$ source setup_env.csh

./bin/frontEndTestGui

Click <read status> and make sure no error is seen. If so, check that the FEB is powered correctly.

Make sure the AxiXadc temperature is ok (50-60C).

Configure with config/FebConfigHw4.xml

Click <read status> and check that more registers are found.

Turn on power to hybrids (see below)

Do a hard reset under commands/FebCore/HybridHardReset (current on AVDDP should drop ~100mA).

Click <Write config>.

Do a soft reset under commands/FebCore/HybridSoftReset.

Check that the hybrid currents measured are ok. Sync status for each channel can be seen in register RceCore/DataPath[x]/Synced, 1xf for powered channels.

Hybrid Power

EPICS control

Instructions for powering hybrids with EPICS.

Manual control

In the DAQ GUI: go to config and turn on power to hybrids using Register: HybridXPwrEn (X=0,1,2,3).

Click <Write config>.  Check that it worked by reading status and voltages/currents.

 

Reloading PGP card drivers

Typically after a reboot we need to reload the pgp card driver. 

$ cd /u1/pgpcard/software/driver_old/

$ ./pgpcard_load


 

  • No labels