Test Run SVT Group C Setup

Group C SVT test setup

HPS 2014 SVT Group C Setup

All operations are from hpstracker in group C. 

Operation

Connect the FEB and hybrid(s). Turn on the power to the FEB (see below for instructions). Remember to turn the fan on the FEB.

Take a calibration run with expert SVT GUI

Start the DAQ:

$ cd /u1/software/software_new

$ source setup_env.csh

./bin/frontEndTestGui

Click <read status>.

Make sure the AxiXAdc temperature is ok (50-60C).

 

 

FEB Power using Keithley

TBF

FEB Power using MPOD with EPICS

N/A

Hybrid Power Control Using SVT Expert GUI

  1. Power the FEB

Hybrid Power using EPICS