You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

 

 

Introduction

The Bunch Length system is responsible for measuring the length of the bunch of electrons after the bunch compressors, using indirect measurement techniques. For a detailed and hopefully entertaining introduction on the physics and mathematics behind the system, please read the document How the Length of the Bunch is Measured.

The system is based on the High-Performance System (HPS) over ATCA built at SLAC. For an introduction, please read ATCA 101.

Use cases

Use cases

Actors

The figures with white heads represent a person and the ones with grey head represent a system.

  • Operator: controls the accelerator, driving the beam with the parameters requested by the user (the users are not represented on this diagram). The Operator is responsible for identifying issues and solve them or call IOC maintainers or Physicists in order to get the best quality of a beam.
  • Physicist: understands and design the connection between the electron and photon beam parameters, how sub-systems are interconnected and how the changing in parameters affects the overall beam quality.
  • IOC maintainer: engineer responsible for diagnosing problems in IOCs, fixing bugs, and improving the software. For ATCA based platform, the IOC maintainer actor can also mean a firmware maintainer, that deals with the FPGA on carrier boards.
  • BPM IOC: this represents an IOC responsible for measuring the electron beam position on a cross-section of the accelerator.
  • Fast feedback: this system receives parameters from key accelerator systems and acts to correct the electron beam.
  • MPS: this is the system responsible for the safety of some of the equipment of the accelerator.
  • BSA: system responsible to hold important data aligned with a specific beam pulse in a way that a user can compare the state of many parameters of the accelerator within the same pulse.

Calculate the maximum current and signal sum

The goal is to receive inputs from sensors and other systems and calculate the maximum current and charge (called signal sum) of the electron beam. Those are indirect measurements representing the amplitude and area of a Gaussian, which are easily translated to a bunch length by the Physicists. Details on this process and the calculation itself are described in How the Length of the Bunch is Measured

The sequence diagram below breaks the bunch length system into software and firmware to be more precise. In this context, the software is considered the code made in C/C++ and running in a CPU with Linux RT as the operating system. Firmware is the code synthesized in the FPGA from a VHDL source code running on the carrier board in the ATCA crate. The maximum current is called IMAX and the charge is called SUM.

High level calculation process

The BPM IOC and the Bunch Length firmware are triggered by the timing system. The firmware reads and digitizes the sensors upon receiving the trigger. Once the software receives TMIT from the BPM through the FCOM network, it resends the info to the firmware that uses it to calculate IMAX and SUM. The firmware sends the results to the software, that directs the info to two different places: the Fast Feedback receives it through the FCOM network and the BSA has its records filled with them.

Introduction to FCOM can be found here: Using FCOM in the IOC App.

The Bunch Length system uses two separate threads to deal with the data:

Basic BLEN core

The FCOM thread is responsible for sending the TMIT information to the firmware as soon as it arrives from the BPM IOC. The BSA thread is responsible to receive the result from the firmware, send it to the Fast Feedback system, and store it in the BSA records.

The sequence of actions of each thread is described in details below:

FCOM thread task

BlenFcom processBlob()

BSA thread task

Control filters and check status of them

  • No labels