HPS 2014 SVT Group C Setup

All operations are from hpstracker in group C. 

Operation

!!! Remember to make sure the detector is being cooled. !!!

SVT EPICS Power Instructions

Basic instructions to take a pedestal run with CODA

To be added.

 

MPOD Power Map

Table as of 11/17/2014 

GUI FEB IDPhysical FEBStatusComment
0L1t

OK

 
1

L2-3t

OK 
2L5tOK 
3L6tOK 
4L4tOKThese should be checked!
5L4bOK
6L5bOK 
7L6bDIG bad (Y-cable problem?) 
8L2-3bOK 
9L1bShort on AVDD? 
GUI Flange IDPhysical Flange BoardStatus
01 (top)OK
12OK
23OK
34 (bottom)OK

 

 

Reloading PGP card drivers

Typically after a reboot we need to reload the pgp card driver. 

$ cd /u1/pgpcard/software/driver_old/

$ ./pgpcard_load


 

OLD: Take a calibration run with expert SVT GUI

 

Start the DAQ:

 

$ cd /u1/software/software_new

 

$ source setup_env.csh

 

$ ./bin/frontEndTestGui

 

Click <read status> and make sure no error is seen. If so, check that the FEB is powered correctly.

 

Make sure the AxiXadc temperature is ok (50-60C).

 

Configure with config/FrontEndBoardConfigC01.xml

 

Click <read status> and check that more registers are found.

 

Turn on power to hybrids (see below)

 

Do a hard reset under commands/FebCore/HybridHardReset (current on AVDDP should drop ~100mA).

 

Click <Write config>.

 

Do a soft reset under commands/FebCore/HybridSoftReset.

 

Check that the hybrid currents measured are ok. Sync status for each channel can be seen in register RceCore/DataPath[x]/Synced, 1xf for powered channels.

 


 

Test Run SVT Group C Setup

 

Group C SVT test setup

 


 