You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 16 Next »

Documents

HE_PRL_system_FDR-10252023.pptx

LCLS-II Timing System ESD


Rack Profile and CAPTAR

L2KG07-16.R2.xlsx

L2KG07-49.R2.xlsx

L2KG04-20.R1.xlsx

L2KG10-23.R1.xlsx

phase-reference-line coordinates_HE_07-05-2023_Procurement.xlsx

PRL CAPTAR-L2PRL2.R0.xlsm

LCLS2_HE_LO-panel distribution_08-25-2022.xlsx

Diagrams

LCLSII System Diagram

Meeting Notes

Procurement Tracking

PRL Rigid Line Procurement Tracking.xlsx

Timing_BOE_HE-10252023.xlsx

PCBs

PC_261_100_94_CXX

PC_261_100_53_CXX

PC_376_386_98_C01: HMC1119 Variable Attenuator

PC_376_366_60_C00

PC_376_366_61_C00

PC_376_366_53_CXX

LCLSII-PRL-PLL SW/FW

Chassis

Beckhoff

Power Amplifiers

Change of Baseline:

  1. Modify the Variable Attenuator PCB
    • New PCB status
    • Long term measurement in the lab

2. Improve the isolation between splitted channels in MO-LO Gen

3. Improve the power supply for the MO-LO Gen

4. Add PRL diagnostic tool

  • Increase FPGA capacity for data streaming.
  • No labels