You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Next »

Agenda:

  1. MC software and production updates - Tongtong
  2. Intro to OSG for HPS - Nathan
  3. SVT calibration/alignment status - PF
  4. 2019 Reconstruction Readiness - Norman
  5. MC needs
  6. AOB/Questions

Notes:

MC Software: Tongtong presented the steps taken to produce a sample of radiative mu+mu- events ( pass0 of muon trident for 2019 MC ). He also implemented an FEE trigger simulation (git iss735) to be used for FEE studies.

MC Production:  Tongtong has produced a sample of FEEs to be used to characterize the SVT momentum resolution. Cameron will produce additional samples of WAB LHE files 

HPS@OSG: Nathan presented a status report on initial attempts to use the OSG for MC production. A number of issues need to be resolved, but a pathway exists for testing.

SVT Alignment / Calibration: PF discussed some remaining issues with the alignment. Alignment using the FEEs appears to have plateaued, will start working with V0 skims.

MC Needs: A discussion ensued on the Monte Carlo needs for the 2019 analysis. This needs input from the analysis groups.

  • No labels