Reason for change:

We request to deploy datamonitoring/AlarmsCfg-07-01-06 in L1proc

In this new tag we relaxed the limits  for the Lac threshold one CAL channels (tower 10, layer 7 col 6, neg face) and on the pedestal deviation of CAL channel 824 (tower4,Layer 2, column 4, face 0 ) for HEX1 and HEX8 ranges. 

Test Procedure:

This version of AlarmsCfg has been tested processing locally the monitoring products from two LPA runs (775352080, 775386205).

Rollback procedure:

The package can be rolled back to the previous version by flipping a soft link. Also note that the package is completely independent from any other package running in the pipeline and will not cause a version change of L1Proc.

CCB JIRA:


SSC-474 - Getting issue details... STATUS

Details:

from AlarmsCfg/doc/release.notes:

AlarmsCfg-07-01-06 29-Jul-2025 maldera
 - updating limits on CAL ped deviations for channmel 824 (Tower 4, Layer 2, Column 4, Face 0) :
       CalXAdcPedPedMeanDeviation_HEX1_TH1  upper warning limit changed from 2.5 to 6,  upper error limit from 5 to 7
       CalXAdcPedPedMeanDeviation_HE8_TH1:  upper warning limit changed from 20 to 40

 -Relaxing alarm limits for  cal Lac threshold:
       Lac_Thresholds_FaceNeg_TH1_TowerCalLayerCalColumn_10_7_6:  upper warning limit changed from 2.85 to 3, error limit from 3 to 3.5

  Relevant thread: https://www-glast.stanford.edu/protected/mail/datamon/6425.html

  • No labels