The RIS is the system that prevents us from having high power SPL in the hutch accidentally.
This procedure is done by the MEC Controls Engineer (Peregrine) 1x year when certifying the next year's BLA.
This is the procedure that's done every 2 months (~periodically). (This is the home-brewed Checklist that's easier to follow.)