Detectors

Standard

  • Questar cameras
    • Use NF/FF Alvium instead of moving Questar #2.
  • Zyla for Optique Peter

Experiment Specific

  • 1 X Epix100a : for Inelastic X-ray scattering (sits above target)
  • 2 X Epix100a : for diffraction
  • 1 X Epix Quad : for diffraction as a backup, if the Epix100a don’t survive EMP
  • 1 x Alvium  camera for extra optical alignment 
    • Mounted at NE viewport
  • X-ray diode: Kaz installing Wave8 24/25 June 2025. IPIMB as backup.

XRT Spectrometer needed; Hae Ja has contacted Takahiro/Sanghoon

Motorization

Standard

  • 6 X MFA (for the drive lenses)
  • 3 X MFA (Visar)
  • 500mm stage for Zyla
  • MEC target stage
  • JJ-slit is chamber need to work reliably
    • We will definitely need the in-chamber X-ray slits for this beamtime : these requires 4 motors that come with the slit

Experiment Specific

  • 3 X Analyser mounts : which have 2 dumb stepper motors each, so 6 in total
    • 6 dumb motors on the diced crystal anaylser (3 analyzers) mounts
  • Monochromator:
    • 3-axis stage (from xrts)
      • 3 axis XYZ stage (old XRTS stage) for under mono
    • 4 X Newport LTA stages : for 2 motorized tip-tilt mirror that have the mono crystals
  • VT-50-100 below the Inelastic scattering Epix 100 camera


Notes on PR-60 Dumb Motor Channels

What we need:

  • Target stage - already connected at USR 17
  • 6 analyzer channels
    • From McBride L-10177: Faulhber_SA_15_8_141 config (under MEC VT50) with encoders and limit switches disabled.
  • 1 VT-50-100

XRTS uses DB50 to TC1 07-09, not on PR-60.

Current Usage (Planned in Bold):

PVDESCPVDESC
USR 17Tg X (in place)USR 18DEAD
USR 19

SPL Ref Laser (IN: 90)

A1H

USR 20

Vac Iris (close:  630, open: -1100)

A1V

USR 21Optique Peter (1 is in focus x4)USR 22

SPL Filter (in 90, out 5)

A2H

USR 23

SPL Power Meter (IN:195, OUT::-40)\

A2V

USR 24DEAD
USR 25

null

A3H

USR 26

N/A

A3V

USR 27

MIcos Filter Wheel (No Filter: 21)

epix100a VT-50-100

USR 28N/A
NO CONNECTOR
NO CONNECTOR
TC1 22MXI Z (0 is 10cm from TCC)TC1 23Talbot Y

Configuration

As built XPS2 (27 June 2025).

Cable and FF usage TBD, Peregrine will verify on Monday. Here is the controller usage:

  • 09 - VISAR X MFA
  • 10
  • 11 - VISAR Z MFA
  • 12 - VISAR Y MFA
  • 13
  • 14
  • 15
  • 16

As built XPS3 (27 June 2025).

Cable and FF usage TBD, Peregrine will verify on Monday. Here is the controller usage:

  • 17 - South Y MFA
  • 18 - South X MFA
  • 19 - Talbot X UTS
  • 20
  • 21 - North X MFA
  • 22 - North Z (DO NOT MOVE) MFA
  • 23 - North Y MFA
  • 24 - South Z MFA

As built XPS4 (27 June 2025).

Cable and FF usage TBD, Peregrine will verify on Monday. Here is the controller usage:

  • 25 - Mono 2 hor LTA
  • 26 - Mono 2 vert LTA
  • 27
  • 28 - Mono 1 vert LTA
  • 29 - Mono  1 hor LTA
  • 30
  • 31
  • 32

Status

ComponentItemStagePVsFeedthruCommentsOperational
LPLEast Drive Lens3 X MFA

MEC:PPL:MMN:17

MEC:PPL:MMN:18

MEC:PPL:MMN:19

T5/*1, XPS 3/1

T5/*2, XPS 3/2

T5/*3, XPS 3/3


Y


West Drive Lens3 X MFA

MEC:PPL:MMN:20

MEC:PPL:MMN:21

MEC:PPL:MMN:22

T5/*4, XPS 3/4

T5/*5, XPS 3/5

T5/*6, XPS 3/6


Y

VISAR

Lens

3 X MFA

TBD XPS4 channels

B5/TBD, and then to XPS4



Zyla

500mm stage

1 X IMS500P

MEC:PPL:MMN:25

in-air, XPS 4/1


Y

Talbot X


1 x UTS100PP

MEC:PPL:MMN:19



Y

Target

X stage

1 X IMS

MEC:USR:MMS:17

D2c/D5

pmgr: PLS85 In-Vac

Y

XRTS

XYZ

3 X IMS

MEC:TC1:MMS:{07,08,09} 

for Z,Y,X.

D2c/D10

Using old XRTS stage

pmgr: XUV Z/Y/X

Y

pmgr, air-side cable, vac cable

Analyzer 1 H+V2 X IMS

MEC:USR:MMS:{19,20} 

for H,V.


USR 19 moved to USR 27

D2c/D6

pmgr: Faulhber_SA_15_8_141  (under MEC VT50) with encoders and limit switches disabled

Y

pmgr, encoder/ls modes verified in motor-expert-screen, DESC="Analyzer 1 H/V", air-side cable, vac cable

Analyzer 2H+V2 X IMS

MEC:USR:MMS:{22,23} 

for H,V.

D2c/D7

pmgr: Faulhber_SA_15_8_141  (under MEC VT50) with encoders and limit switches disabled

Y

pmgr, encoder/ls modes verified in motor-expert-screen, DESC="Analyzer 2 H/V". air-side cable, vac cable

Analyzer 3H+V2 X IMS

MEC:USR:MMS:{25,26} 

for H,V.

D2c/D9

pmgr: Faulhber_SA_15_8_141  (under MEC VT50) with encoders and limit switches disabled

Y

pmgr, encoder/ls modes verified in motor-expert-screen, DESC="Analyzer 3 H/V", air-side cable, vac cable

epix100a VT-50-100
1 X IMS

MEC:USR:MMS:27 


moved to USR 19 (connector issues on PR60)

T5/1pmgr: VT-50-100

pmgr, DESC="Epix100 Stage", USR 23 cable (labeled VT50 on DB15 end)




  • No labels