maA Note to Readers
Please skip ahead to the ongoing work plan at WorkPlan(restructuredbycomponent).
1008961 Czapla to 1008968 Galtier Transition
- for both inhouse, we need: M5, ref laser, power meter, vacuum iris, filter, OAP. For the imaging system, if we have the MPI, we will use it, if we don't we will use the TSO
| Component | Item | Use | Stage | PVs | Comments | New Cabling Resources | Feedthru |
|---|---|---|---|---|---|---|---|
| SPL | Ref laser | Both | 1 X IMS | MEC:USR:MMS:19 | From Rocca | T5/5 DB15 | |
No longed needed due to MPA1 work. | N/A | ||||||
| Power meter | Both | 1 X IMS | MEC:USR:MMS:23 | From Rocca | T5/2 DB15 | ||
| Vacuum ris | Both | MEC:USR:MMS:20 | From Rocca | T5/#4 DB9 | |||
| M5 Tip | Both | 1 X Newport | MEC:PPL:MMN:09 | From Rocca | B7/H1 DB25 | ||
| M5 Tilt | Both | 1 X Newport | MEC:PPL:MMN:11 | From Rocca | B7/H3 DB25 | ||
| Optique Peter | Focus | Both | 1 X IMS | MEC:USR:MMS:21 | In air stage | N/A | |
Large translation | Both | 1 x Newport | MEC:PPL:MMN:23 | In air stage | N/A | ||
| Focusing Optics | OAP | Both | 3 X IMS | MEC:TC1:MMS:14 MEC:TC1:MMS:15 MEC:TC1:MMS:16 | From Rocca Off-axis parabola in the GUI | B1?? DB50 | |
| MXI | 500mm | Both | 1 X IMS | MEC:TC1:MMS:22 | From Rocca | B5/B6 DB25 | |
| small hexapod | Both | 1 X Hexapod | MEC:HEX:03 | From Rocca | Hex | ||
| Filter Wheel | AFW-65 | Both | 1 X IMS | MEC:USR:MMS:27 | From Rocca | T5/#1 DB9 | |
| schlieren imaging | 2 x MFA 25 mm | Both | 2 X Newport | MEC:PPL:MMN:17 MEC:PPL:MMN:18 | Both MFA | ?? DB25 ?? DB25 | |
| 1 x UTS150 | Both | 1 x Newport | MEC:PPL:MMN:22 | UTS | ?? DB15 | ||
| TSO option | Hor LTA | Galtier | 1 X Newport | MEC:PPL:MMN:20 | installed | ?? DB25 | |
| Focus LTA | Galtier | 1 X Newport | MEC:PPL:MMN:21 | installed | ?? DB25 | ||
| Ver UTS150 | Galtier | 1 X Newport | MEC:PPL:MMN:19 | installed | ?? DB15 | ||
| Talbot grating | UTS100 X | Nick | 1 X Newport | TBD | in air | to add | N/A |
| UTS100 Z | Nick | 1 X Newport | TBD | in air | to add | N/A | |
PL65 Vertical PLS-85?? | Nick | 1 X IMS | Planned:
pmgr:
| in air | to add | N/A | |
| alviums | NF/FF | Both | 1 X Alvium | DAQ only | From Rocca | N/A | |
| Timetool | Both | 1 X Alvium | DAQ only | From Rocca | N/A | ||
| spl_spot | Both | 1 X Alvium | DAQ only | From Rocca | N/A | ||
Second Downstream detector | Imager | Galtier | 1 X Andor Zyla | DAQ only | Need:
| to connect on the DAQ | |
Y | Galtier | 1 X Newport | TBD | UTS100 | 1 x MSCABLE | N/A | |
optique peter focus | Galtier | 1 X IMS | Planned:
pmgr:
| TBD | 1 x DB25 F? - TT19P | N/A | |
grating installed in the HRM1 instead of the Si mirror | Galtier | None | N/A | No ECS work required. | N/A | ||
| Crystal assembly | 6 x X | Galtier | None | N/A | UMR - manual stage, no work | N/A | |
| 6 x Y | Galtier | 6 X IMS | Planned:
pmgr:
| VT50L | 6 x DB15 F-F Passthru vacuum cables 6 x DB15 F - TT19P air cables | 6 X TBD DB15 | |
| 6 x Z | Galtier | 6 X Newport | TBD | MFA, asking CXI if they can lend us a spare MFA | 6 x DB25 F-F vac 6 x MMCABLE | 6 x TBD DB25 | |
| 6 x Rotation | Galtier | no motor control - but 6 feedthrus. | N/A | PR-50, MMC-100 and PC control, no ECS work | 6 x PR-50 Vacuum Motor Cable (Female Dsub 9 Pin, 1.5m) 6 x Atmospheric Motor Cable (Female to Male Dsub 9 Pin, 1.5m) | 6 X TBD DB9 | |
| 5 x chi motion | Galtier | None | N/A | 561-GON - manual stage | N/A | ||
| 1 x chi motorized | Galtier | 1 x smaract | TBD |
| B8/TBD DB15 | ||
stack of 25 lenses of 50 mic radius of curvature | |||||||
Replacement for small hexapod | XYZ | Galtier | 3 x IMS | Planned:
pmgr:
| need to check in air, check flange of in vacuum IMS | 3 x VT50 vac 3 x VT50 air | 3 x TBD DB15 |
| Tip/Tilt | Galtier | 2x IMS | Planned:
pmgr:
| need to check in air | 2 x MP-20 vac 2 x MP-20 air | 2 x TBD DB9 | |
Spare crystal alignment capability | 1-2 x translation | Galtier | 2 x IMS | Planned:
pmgr:
| VT50/VT50L | get spare in air | 2 x TBD DB15 |
Alvium camera for alignment in chamber | 1 x whatever format | Galtier | - | DAQ only | reuse the front illumination camera, DAQ alias sample | ||
Diodes for alignment | max 4 (could have up to 6) | Galtier | in vac sma cables | N/A | 4 channels in the scope under the X-ray optical table | potentially new sma vac cable needed | SMA |
Motor Controller Usage
Type | Have Available | Need |
|---|---|---|
| IMS |
|
|
| Newport |
|
|
| Smaract | at least 4 |
|
Feedthru Usage
| SMA | 1 | 1 | ||
| DB9 | 2 | 8 | 10 | |
| DB15 | 3 | 2 | 6 | 11 |
| DB25 | 3 | 4 | 6 | 13 |
| DB50 | 1 | 1 | ||
| Hex | 1 | 1 |
In-House Cable Needs
Past and New Cable Orders
Past
- VT-50 vacuum (DB15F-DB15M): TIDAT-882 - (Peregrine McGehee) Generic vacuum DB15F-DB15M cables Done
- IMS motor control (DB15F-TT19P): TIDAT-2126 - (Peregrine McGehee) Reterminate MEC in-air motor cables Done
New
- VT-50 air and vacuum: TIDAT-2303 - Air and vacuum cables for Micos VT-50 stages CABLE Fabrication Only
Newport Cable Needs
| Talbot | UTS | 2 | Czapla only | |||
| Zyla2 | UTS | 1 | ||||
| Xtal | MFA | 6 | 6 | |||
| OPA2 | UTS (vertical) | 1 | ||||
| Totals | 4 | 6 | 0 | 6 | ||
| Location | None (so far) in grey cabinet. | N/A | Vac motor cable drawer: 2,6,8,9,10 Flange B7: 3 |
IMS/Smaract Cable Needs
| Talbot | PLS-85 | 1 (check) | Czapla only | |||||||
| Xtal | VT50-L | 6 | 6 | |||||||
| chi | 1 | Smaract, have air-side on B8. | ||||||||
| PR-50 | 6 x DB9 F-M to MMC-100 | 6 DB9 M-F Passthru | ||||||||
| OPA2 | MFA (focus) | 1 (custom?) | Newport but run as IMS | |||||||
| Hex2Sub | XYZ | 3 | 3 | 3 stages VT50s | ||||||
| T/T | 2 | 2 | 2 Micos MP-20 | |||||||
| Totals | 6 | 3 | 9 | 0 | 8 | 1 | 9 | 0 | ||
| Location | Check on PR-50 air cables. | OPA2 focus cable should have been delivered with stage. Matt Seaberg will look for it (Wednesday) | Ordered. | N/A | Check on PR-50 Vac cables. From T5: (no label), #3. We'll need M-M gender changers if need these - if too far for direct connection. | Plenty from T5/T6: 1, 4, 7, 13/SPL FILTER, MEC:USR:MMS:22, MEC:USR:MMS:25 | Ordered. Also have 3 in vac motor cable drawer. | N/A |
Work Plan (restructured by component)
Are you looking for a spare feedthru of format .... ?
- For DB9 try B5, B6, T5, T6, or D2c.
- For DB15 try B1, B4, B7, B8, T5, T6, or D2c
- T5/ 1, 2, 6, 7
- T6/ 9, 10, 11, 13,. 15, 18
- For DB25 try B1, B3, B5, B6, B7, T5, or T6
- For SMA Coaxial try B4, T5, or T6
Air-Side Cable Routing
| Name | Route | Use in this experiment |
|---|---|---|
| IMS Motor Cables | ||
| VT50 #1 | T5/1 to HXM:PRT:01:MMS:01 | Crystal Y |
| VT50 #2 | T5/6 to HXM:PRT:01:MMS:02 | Crystal Y |
| VT50 #3 | T5/7 to HXM:PRT:01:MMS:03 | Crystal Y |
| VT50 #4 | T6/9 to HXM:PRT:01:MMS:04 | Crystal Y |
| VT50 #5 | T5/2 to HXM:PRT:01:MMS:05 | Crystal Y |
| VT50 #6 | T6/11 to HXM:PRT:01:MMS:06 | Crystal Y |
| VT50 #7 | T6/13 to HXM:PRT:01:MMS:07 | HexSub X |
| VT50 #8 | T6/15 to HXM:PRT:01:MMS:08 | HexSub Y |
| VT50 #9 | T6/18 to HXM:PRT:01:MMS:09 | HexSub Z |
| DB9 #1 | T6/1 to HXM:PRT:01:MMS:10 | HexSub Tip |
| DB9 #2 | T6/2 to HXM:PRT:01:MMS:11 | HexSub Tilt |
| OP Focus #2 | OP2 to HXM:PRT:01:MMS:12 | Optique Peter #2 |
Where are these flanges?
- Here's our map:
- Flanges are numbered clockwise starting from the west (upstream) as seen from above
- B = bottom, T = top, D = door.
DONE Portable Motor rack
- DONE Moxa network set-up using front panel
- Configure for DHCP, following Moxa NPort 6650 Setup
- DONE Verify network connection
- DONE Power to MForce power supply
Talbot (in-air)
| Item | Comments | Status |
|---|---|---|
Select IMS connection for Talbot vertical stage | MEC:TC1:MMS:23 | Done |
Set pmgr config for corresponding PV to "PLS-85" |
| Done |
| Connect vertical stage | Used Talbot labeled HDB 15 to TT19P cable (CA-261-805-23-C00) to MEC:TC1:MMS:23 (PR-60) | Done |
| Connect X stage to XPS4 | Using Talbot labeled MSCABLE to MEC:PPL:MMN:24 (XPS3) | Done |
| Connect Z stage to XPS4 | Using Talbot labeled MSCABLE to MEC:PPL:MMN:19 (XPS3) | Done |
| Test all stages | Done |
Upstream platform
Rotation (User Responsibility)
Resources Needed3 x PR-50 Vacuum Motor Cable (Female Dsub 9 Pin, 1.5m)3 x Atmospheric Motor Cable (Female to Male Dsub 9 Pin, 1.5m)3 x DB9 FeedthrusConnected to MMC-100, No IOC
ConnectionsPR-50 #1 to TBD FF to MMC-100PR-50 #2 to TBD FF to MMC-100PR-50 #2 to TBD FF to MMC-100
Tasks
| Comments | |
|---|---|---|
|
| |
|
| |
Crystal Y stages
- Resources Needed
- 3 x DB15 F - F Passthru vacuum cables (from Lupe)
- 3 x DB15 F - TT19P air cables (from Lupe)
- 3 x DB15 Feedthrus
- Connections
- Y VT-50 #1 to TBD FF to HXM:PRT:01:MMS:01
- Y VT-50 #2 to TBD FF to HXM:PRT:01:MMS:02
- Y VT-50 #3 to TBD FF to HXM:PRT:01:MMS:03
- pmgr: VT-50-100-L (all)
- Tasks
| Item | Comments | Status |
|---|---|---|
Select 3 DB15 feedthrus for Y stages #1, #2, #3 | Feedthrus
| Done |
Set pmgr config for HXM:PRT:01:MMS:{01-03} to "VT-50-100-L" | Set as "VT-50-100" | Ask Eric if need to switch to "VT-50-100-L", otherwise Done |
| Connect DB15F to TT19P cables from feedthrus to portable rack |
| Done |
| Connected DB15 vacuum cables from feedthrus to VT-50 stages |
| |
| Test all stages |
Crystal Z stages
Item | Comments | Status |
|---|---|---|
Determine if there is a distance issue from T6 to stages | Eric | |
Connect feedthrus T5/3*, T6/6, and T6/7 using Newport controller XPS4 |
| Done |
Connect Z MFA stages #1 - #3 to feedthrus T5/3*, T6/6, and T6/7 using cables attached to motors |
| |
| Test all stages |
Downstream platform
Rotation (User Responsibility)
Resources Needed3 x PR-50 Vacuum Motor Cable (Female Dsub 9 Pin, 1.5m)3 x Atmospheric Motor Cable (Female to Male Dsub 9 Pin, 1.5m)3 x DB9 FeedthrusConnected to MMC-100, No IOC
ConnectionsPR-50 #4 to TBD FF to MMC-100PR-50 #5 to TBD FF to MMC-100PR-50 #6 to TBD FF to MMC-100
Tasks
| |
|---|---|
| |
| |
Crystal Y stages
| Item | Comments | Status |
|---|---|---|
Select 3 DB15 feedthrus for Y stages #4, #5, #6 | Feedthrus:
| Done |
Set pmgr config for HXM:PRT:01:MMS:{04-06} to "VT-50-100-L" | Set as "VT-50-100" | Ask Eric if need to switch to "VT-50-100-L", otherwise Done |
| Connect DB15F to TT19P cables from feedthrus to portable rack |
| Done |
| Connect DB15 vacuum cables from feedthrus to VT-50 stages |
| |
| Test all stages |
Crystal Z stages
Item | Comments | Status |
|---|---|---|
Connect feedthrus B5/B5, B5/B7, and B5/B9 to Newport controllers XPS1 and XPS2 |
| Done |
Connect Z MFA stages #4- #6 to feedthrus B5/B3, B5/B5, and B5/B7 using cables attached to motors |
| |
| Test all stages |
Motorized Chi (Smaract)
- Resources Needed
- Note: Air-side cabling already to B8, FF TBD (several connected)
- Vacuum cable (TBD)
- Connections
- Stage to B8/TBD to Smaract controller
- Tasks
Item | Comments | Status |
|---|---|---|
Connect vacuum cable from one of the Smaract connections on B8 to the stage | Air side connections already in-place | |
| Test the stage |
Hexapod Replacement
XYZ Stages
| Item | Comments | Status |
|---|---|---|
Select 3 DB15 feedthrus for X, Y, and Z stages | Feedthrus:
| Done |
Set pmgr config for HXM:PRT:01:MMS:{07-09} to "VT-50-100-L" | Set as "VT-50-100" | Ask Eric if need to switch to "VT-50-100-L", otherwise Done |
| Connect DB15F to TT19P cables from feedthrus to portable rack |
| Done |
| Connected DB15 vacuum cables from feedthrus to VT-50 stages |
| |
| Test all stages |
Tip/Tilt Stages
- Resources Needed
- 2 x vacuum cabling
- Direct connection or
- DB9 vacuum cables + gender changers
- 2 x DB9F - TT19P air cables
- 2 x DB9 Feedthrus
- 2 x vacuum cabling
- Connections
- Tip MP-20 to TBD FF to HXM:PRT:01:MMS:10
- Tilt MP-20 to TBD FF to HXM:PRT:01:MMS:11
- pmgr: MP-20 w or w/o limits?
- Tasks
| Item | Comments | Status |
|---|---|---|
Select 2 DB9 feedthrus for Tip and Tilt stages | Feedthrus
| Done |
Set pmgr config for HXM:PRT:01:MMS:{10,11} to "MP-20" or "MP-20 w/ Limits". | Set as "MP-20" | May need to switch to "MP-20 w/ Limits" |
| Connect DB9F to TT19P cables from feedthrus to portable rack |
| |
Connects stages to feedthrus | If possible use direct connections from stages to feedthru, or else need DB9 vacuum cables with gender changers | |
| Test all stages |
Beam Stop
Zyla #2
| Item | Comments | Status |
|---|---|---|
Find and connect blue USB cable to Zyla | Eric | |
Connect blue USB cable to USB extender | We will use one of the other USB extenders that are connected to daq-mec-cam05. Running two Zylas on the same host (daq-mec-cam03) will cause operational difficulties. The MEC daq-config has been updated accordingly. | |
Find and connect trigger cable to Zyla | Eric | |
| Add a T connector to the end of the green BNC and attach both Zyla triggers to it. | T connection added, waiting on second camera trigger cable. | |
Verify that other end of green BNC goes to a single connection on PR-60 patch panel. | It goes to #0, all good. | Done |
| Verify operation in DAQ |
Optique Peter (in-air)
| Item | Comments | Status |
|---|---|---|
Set pmgr config for HXM:PRT:01:MMS:12 to "Optique Peter Focus" |
| Done |
Connect focus stage using focus cable to HXM:PRT:01:MMS:12. | Need IMS motor extension cable. Vincent says there are some in the XRT, which is open on Tuesday | |
Remove MSCABLE-3 from XPS2 #7 or #8 - XTCS connection | Look at flange B5, and then remove for use here. Connected to two rightmost ports on Newport patch panel to left of JJ Slit PLC. | |
Connect Vertical stage (UTS100) via MSCABLE-3 to MEC:PPL:MMN:28 (XPS4) |
| |
| Test all stages |
Alignment System
DONE Alvium camera for alignment in chamber
- Resources Needed
- None (Reuse the front illumination camera, DAQ alias sample)
- Connections
- None
- Tasks: Completed.
Diodes for alignment
Tasks for instrument scientists.
| Item | Comments | Status |
|---|---|---|
Select up to 4 SMW Coaxial feedthrus | See on T5 and T6 | |
Connect feedthrus to channels in the scope under the X-ray optical table |
| |
Connect diodes to feedthrus using vacuum SMA cables |
|
Spare crystal alignment capability
TBD - talk to Eric
| Item | Comments | Status |
|---|---|---|
Determine how many, if any, free channels are available on the PR-60 dumb motor patch panel. If there are none then stop here. |
| |
Select DB15 feedthrus |
| |
Set pmgr config for available channels to "VT-50-100-L" |
| |
| Connect DB15F to TT19P cables from feedthrus to PR-60 | ||
| Connected DB15 vacuum cables from feedthrus to VT-50 stages | ||
| Test all stages |