maA Note to Readers

Please skip ahead to the ongoing work plan at WorkPlan(restructuredbycomponent).

1008961 Czapla to 1008968 Galtier Transition

  • for both inhouse, we need: M5, ref laser, power meter, vacuum iris, filter, OAP. For the imaging system, if we have the MPI, we will use it, if we don't we will use the TSO


ComponentItemUseStagePVsCommentsNew Cabling  ResourcesFeedthru
SPL Ref laserBoth1 X IMSMEC:USR:MMS:19From Rocca
T5/5 DB15
FilterBoth1 X IMSMEC:USR:MMS:21

From Rooca

No longed needed due to MPA1 work.


N/A

Power meterBoth1 X IMSMEC:USR:MMS:23From Rocca
T5/2 DB15
Vacuum risBoth
MEC:USR:MMS:20From Rocca
T5/#4 DB9
M5 TipBoth1 X NewportMEC:PPL:MMN:09From Rocca
B7/H1 DB25
M5 TiltBoth1 X NewportMEC:PPL:MMN:11From Rocca
B7/H3 DB25
Optique Peter

Focus

Both

1 X IMS

MEC:USR:MMS:21

In air stage


N/A

Large translation

Both

1 x Newport

MEC:PPL:MMN:23

In air stage


N/A

Focusing Optics

OAP

Both

3 X IMS

MEC:TC1:MMS:14

MEC:TC1:MMS:15

MEC:TC1:MMS:16

From Rocca

Off-axis parabola in the GUI


B1?? DB50

MXI500mmBoth1 X IMSMEC:TC1:MMS:22From Rocca
B5/B6 DB25
small hexapodBoth1 X HexapodMEC:HEX:03From Rocca
Hex
Filter WheelAFW-65Both1 X IMSMEC:USR:MMS:27From Rocca
T5/#1 DB9 
schlieren imaging2 x MFA 25 mmBoth2 X Newport

MEC:PPL:MMN:17

MEC:PPL:MMN:18

Both

MFA


?? DB25

?? DB25

1 x UTS150Both1 x NewportMEC:PPL:MMN:22

UTS


?? DB15
TSO optionHor LTAGaltier1 X NewportMEC:PPL:MMN:20installed
?? DB25
Focus LTAGaltier1 X NewportMEC:PPL:MMN:21installed
?? DB25
Ver UTS150Galtier1 X NewportMEC:PPL:MMN:19installed
?? DB15
Talbot gratingUTS100 XNick1 X NewportTBDin airto addN/A
UTS100 ZNick1 X NewportTBDin airto addN/A

PL65 Vertical

PLS-85??

Nick1 X IMS

Planned:

  • TBD - whatever is free on PR-60 (high priority)

pmgr:

  • PLS-85??
in airto addN/A
alviumsNF/FFBoth1 X AlviumDAQ onlyFrom Rocca
N/A
TimetoolBoth1 X AlviumDAQ onlyFrom Rocca
N/A
spl_spot Both1 X AlviumDAQ onlyFrom Rocca
N/A

Second Downstream detector




ImagerGaltier1 X Andor ZylaDAQ only

Need:

  • USB cable
  • trigger 
to connect on the DAQ

Y

Galtier 1 X NewportTBDUTS100

1 x MSCABLE

N/A

optique peter focus

Galtier1 X IMS

Planned:

  • HXM:PRT:01:MMS:12

pmgr:

  • Optique Peter Focus
TBD

1 x DB25 F? - TT19P

N/A

grating

installed in the HRM1 instead of the Si mirror


GaltierNoneN/ANo ECS work required. N/A
Crystal assembly6 x XGaltierNoneN/AUMR - manual stage, no work
N/A
6 x YGaltier6 X IMS

Planned:

  • HXM:PRT:01:MMS:01 
  • HXM:PRT:01:MMS:02
  • HXM:PRT:01:MMS:03
  • HXM:PRT:01:MMS:04
  • HXM:PRT:01:MMS:05
  • HXM:PRT:01:MMS:06

pmgr:

  • all VT-50-100-L
VT50L

6 x DB15 F-F  Passthru vacuum cables

6 x DB15 F - TT19P air cables

6 X TBD DB15

6 x ZGaltier6 X NewportTBDMFA, asking CXI if they can lend us a spare MFA

6 x DB25 F-F vac

6 x MMCABLE

6 x TBD DB25

6 x RotationGaltierno motor control - but  6 feedthrus.N/APR-50, MMC-100 and PC control, no ECS work

6 x PR-50 Vacuum Motor Cable (Female Dsub 9 Pin, 1.5m) 

6 x Atmospheric Motor Cable (Female to Male Dsub 9 Pin, 1.5m)

6 X TBD DB9

5 x chi motionGaltierNoneN/A561-GON - manual stage
N/A
1 x chi motorizedGaltier1 x smaractTBD
  • we have the feedthrough
  • we have the in air (likely) and the controller
  • from XPP

B8/TBD  DB15

Small hexapod

stack of 25 lenses of 50 mic radius of curvature


Galtier1 x HexapodMEC:HEX:02


Replacement for small hexapod





XYZGaltier3 x IMS

Planned:

  • HXM:PRT:01:MMS:07
  • HXM:PRT:01:MMS:08
  • HXM:PRT:01:MMS:09

pmgr:

  • all VT-50-100-L
need to check in air, check flange of in vacuum IMS

3 x VT50 vac

3 x VT50 air

3 x TBD DB15
Tip/TiltGaltier2x IMS

Planned:

  • HXM:PRT:01:MMS:10
  • HXM:PRT:01:MMS:11

pmgr:

  • MP-20 or "MP-20 w/Limits"
need to check in air

2 x MP-20 vac

2 x MP-20 air

2 x TBD DB9

Spare crystal alignment capability

1-2 x translationGaltier2 x IMS

Planned:

  • TBD - whatever is free on PR-60

pmgr:

  • all VT-50-100-L


VT50/VT50Lget spare in air2 x TBD DB15

Alvium camera for alignment in chamber

1 x whatever formatGaltier-DAQ onlyreuse the front illumination camera, DAQ alias sample

Diodes for alignment

max 4 (could have up to 6)Galtierin vac sma cablesN/A4 channels in the scope under the X-ray optical tablepotentially new sma vac cable neededSMA

Motor Controller Usage

Type

Have Available

Need

IMS
  •  HXM
    • 12
  • PR-60
    • TBD
  • HXM
    • 6 - Crystal Y
    • 3 - HexSub XYZ
    • 2 - HexSub T/T
    • 1 - OP2 Focus
    • 12 - Total, 0 - Spare
  • PR-60
    • Talbot Vertical
    • Spare crystal alignment?
    • Between -2 and 0 - Spare
Newport
  • XPS1
    • 2: #7, #8
  • XPS2
    • 6: #2,#4 - #8 (after XTCS removal)
  • XPS3
    • 1: #8
  • XPS4
    • 8: #1 - #8
  • Talbot
    • 2 - XZ
  • Zyla2
    • 1 - Y
  • Crystal
    • 6 - Z
  • 9 - Total, 8 Spare
Smaractat least 4
  • Crystal
    • 1 - chi motorized.


Feedthru Usage






SMA

11
DB92
810
DB1532611
DB2534613
DB50
1
1
Hex1

1

In-House Cable Needs

Past and New Cable Orders

Past

  • VT-50 vacuum (DB15F-DB15M): TIDAT-882 - (Peregrine McGehee) Generic vacuum DB15F-DB15M cables Done
  • IMS motor control (DB15F-TT19P): TIDAT-2126 - (Peregrine McGehee) Reterminate MEC in-air motor cables Done

New

  • VT-50 air and vacuum: TIDAT-2303 - Air and vacuum cables for Micos VT-50 stages CABLE Fabrication Only

Newport Cable Needs








TalbotUTS2


Czapla only
Zyla2UTS1



XtalMFA
6
6
OPA2UTS (vertical)1



Totals
460

6


Location
None (so far) in grey cabinet.


N/A

Vac motor cable drawer: 2,6,8,9,10

Flange B7: 3



IMS/Smaract Cable Needs












TalbotPLS-85
1 (check)





Czapla only
XtalVT50-L

6


6


chi




1



Smaract, have air-side on B8.

PR-506 x DB9 F-M to MMC-100


6 DB9 M-F Passthru



OPA2MFA  (focus)
1 (custom?)





Newport but run as IMS
Hex2SubXYZ

3


3
3 stages VT50s

T/T
2

2




2 Micos MP-20











Totals
63

9

081

9

0
Location

Check on PR-50 air cables.

OPA2 focus cable should have been delivered with stage.

Matt Seaberg will look for it (Wednesday)

Ordered.

N/A

Check on PR-50 Vac cables.

From T5: (no label), #3. We'll need M-M gender changers if need these - if too far for direct connection.

Plenty from T5/T6: 1, 4, 7, 13/SPL FILTER, MEC:USR:MMS:22, MEC:USR:MMS:25

Ordered.

Also have 3 in vac motor cable drawer.

N/A

Work Plan (restructured by component)

Are you looking for a spare feedthru of format .... ?

  • For DB9 try B5, B6, T5, T6, or D2c.
  • For DB15 try B1, B4, B7, B8, T5, T6, or D2c
    • T5/ 1, 2, 6, 7
    • T6/ 9, 10, 11, 13,. 15, 18
  • For DB25 try B1, B3, B5, B6, B7, T5, or T6
  • For SMA Coaxial try B4, T5, or T6

Air-Side Cable Routing

NameRouteUse in this experiment
IMS Motor Cables
VT50 #1 

T5/1 to HXM:PRT:01:MMS:01

Crystal Y

VT50 #2

T5/6 to HXM:PRT:01:MMS:02

Crystal Y

VT50 #3

T5/7 to HXM:PRT:01:MMS:03

Crystal Y

VT50 #4

T6/9 to HXM:PRT:01:MMS:04

Crystal Y

VT50 #5

T5/2 to HXM:PRT:01:MMS:05

Crystal Y

VT50 #6

T6/11 to HXM:PRT:01:MMS:06

Crystal Y

VT50 #7

T6/13 to HXM:PRT:01:MMS:07

HexSub X

VT50 #8

T6/15 to HXM:PRT:01:MMS:08

HexSub Y

VT50 #9

T6/18 to HXM:PRT:01:MMS:09

HexSub Z

DB9 #1

T6/1 to HXM:PRT:01:MMS:10

HexSub Tip

DB9 #2

T6/2 to HXM:PRT:01:MMS:11

HexSub Tilt

OP Focus #2

OP2 to HXM:PRT:01:MMS:12

Optique Peter #2






















Where are these flanges?

  • Here's our map:
  • Flanges are numbered clockwise starting from the west (upstream) as seen from above
  • B = bottom, T = top, D = door.

DONE Portable Motor rack

  • DONE Moxa network set-up using front panel
  • DONE Verify network connection
  • DONE Power to MForce power supply

Talbot (in-air)

ItemCommentsStatus

Select IMS connection for Talbot vertical stage

MEC:TC1:MMS:23

Done

Set pmgr config for corresponding PV to "PLS-85"

 

Done
Connect vertical stageUsed Talbot labeled HDB 15 to TT19P cable (CA-261-805-23-C00) to MEC:TC1:MMS:23 (PR-60)Done
Connect X stage to XPS4

Using Talbot labeled MSCABLE to MEC:PPL:MMN:24 (XPS3)

Done
Connect Z stage to XPS4Using Talbot labeled MSCABLE to MEC:PPL:MMN:19 (XPS3)Done
Test all stages
Done

Upstream platform

Rotation (User Responsibility)

  • Resources Needed
    • 3 x PR-50 Vacuum Motor Cable (Female Dsub 9 Pin, 1.5m) 
    • 3 x Atmospheric Motor Cable (Female to Male Dsub 9 Pin, 1.5m)
    • 3 x DB9 Feedthrus
    • Connected to MMC-100, No IOC
  • Connections
    • PR-50 #1 to TBD FF to MMC-100
    • PR-50 #2 to TBD FF to MMC-100
    • PR-50 #2 to TBD FF to MMC-100
  • Tasks

Item

Comments

Status

Select DB9 feedthrus for PR-50 stages #1, #2, #3

 


Connect in-air motor cables from feedthru to MMC-100

 


Connect vacuum cables from feedthru to PR-50s


Crystal Y stages

  • Resources Needed
    • 3 x DB15 F - F Passthru vacuum cables (from Lupe)
    • 3 x DB15 F - TT19P air cables (from Lupe)
    • 3 x DB15 Feedthrus
  • Connections
    • Y VT-50 #1 to TBD FF to HXM:PRT:01:MMS:01 
    • Y VT-50 #2 to TBD FF to HXM:PRT:01:MMS:02
    • Y VT-50 #3 to TBD FF to HXM:PRT:01:MMS:03
  • pmgr: VT-50-100-L (all)
  • Tasks
ItemCommentsStatus

Select 3 DB15 feedthrus for Y stages #1, #2, #3

Feedthrus

  • Y #1 -  T5/1
  • Y #2 - T5/6
  • Y #3 - T5/7

Done

Set pmgr config for HXM:PRT:01:MMS:{01-03} to "VT-50-100-L"

Set as "VT-50-100"

Ask Eric if need to switch to "VT-50-100-L", otherwise Done
Connect DB15F to TT19P cables from feedthrus to portable rack
  • T5/1 to HXM:PRT:01:MMS:01
  • T5/6 to HXM:PRT:01:MMS:02
  • T5/7 to HXM:PRT:01:MMS:03
Done
Connected DB15 vacuum cables from feedthrus to VT-50 stages
  • Y stage #1 to T5/1
  • Y stage #2 to T5/6
  • Y stage #3 to T5/7

Test all stages


Crystal Z stages

Item

Comments

Status

Determine if there is a distance issue from T6 to stages

Eric


Connect feedthrus T5/3*, T6/6, and T6/7 using Newport controller XPS4

  • T5/3* via cable unlabeled to MEC:PPL:MMN:25 (XPS4) 
  • T6/6 via cable XPS2 #4 (3m) to MEC:PPL:MMN:26 (XPS4) 
  • T6/7 via cable XPS3 #4 to MEC:PPL:MMN:27 (XPS4)
Done

Connect Z MFA stages #1 - #3 to feedthrus T5/3*, T6/6, and T6/7 using cables attached to motors

  • Z MFA #1 to T5/3* 
  • Z MFA #2 to T6/6 
  • Z MFA #3 to T6/7 

Test all stages



Downstream platform

Rotation (User Responsibility)

  • Resources Needed
    • 3 x PR-50 Vacuum Motor Cable (Female Dsub 9 Pin, 1.5m) 
    • 3 x Atmospheric Motor Cable (Female to Male Dsub 9 Pin, 1.5m)
    • 3 x DB9 Feedthrus
    • Connected to MMC-100, No IOC
  • Connections
    • PR-50 #4 to TBD FF to MMC-100
    • PR-50 #5 to TBD FF to MMC-100
    • PR-50 #6 to TBD FF to MMC-100
  • Tasks

Item

Status

Select DB9 feedthrus for PR-50 stages #4, #5, #6


Connect in-air motor cables from feedthrus to MMC-100


Connect vacuum cables from feedthrus to PR-50s


Crystal Y stages

ItemCommentsStatus

Select 3 DB15 feedthrus for Y stages #4, #5, #6

Feedthrus:

  • Y #4 - T6/9
  • Y #5 - T5/2
  • Y #6 - T6/11

 

 Done

Set pmgr config for HXM:PRT:01:MMS:{04-06} to "VT-50-100-L"

Set as "VT-50-100"

Ask Eric if need to switch to "VT-50-100-L", otherwise Done
Connect DB15F to TT19P cables from feedthrus to portable rack
  • T6/9 to HXM:PRT:01:MMS:04
  • T5/2 to HXM:PRT:01:MMS:05
  • T6/11 to HXM:PRT:01:MMS:06
Done
Connect DB15 vacuum cables from feedthrus to VT-50 stages
  • Y stage #4 to T6/9 
  • Y stage #5 to T5/2
  • Y stage #6 to T6/11

Test all stages

Crystal Z stages

Item

Comments

Status

Connect feedthrus B5/B5, B5/B7, and B5/B9 to Newport controllers XPS1 and XPS2

  • B5/B9 via cable XPS2 #6 to MEC:PPL:MMN:08 (XPS1)
  • B5/B7 via cable XPS2 #4 to MEC:PPL:MMN:12 (XPS2)
  • B5/B5 via cable XPS2 #1 to MEC:PPL:MMN:14 (XPS2)
Done

Connect Z MFA stages #4- #6 to feedthrus B5/B3, B5/B5, and B5/B7 using cables attached to motors

  • Z MFA #4 to B5/B9
  • Z MFA #5 to B5/B7
  • Z MFA #6 to B5/B5

Test all stages



Motorized Chi (Smaract)

  • Resources Needed
    • Note: Air-side cabling already to B8, FF TBD (several connected)
    • Vacuum cable (TBD)
  • Connections
    • Stage to B8/TBD to Smaract controller
  • Tasks

Item

Comments

Status

Connect vacuum cable from one of the Smaract connections on B8 to the stage

Air side connections already in-place


Test the stage



Hexapod Replacement

XYZ Stages

ItemCommentsStatus

Select 3 DB15 feedthrus for X, Y, and Z stages

Feedthrus:

  • X - T6/13
  • Y - T6/15
  • Z - T6/18
 Done

Set pmgr config for HXM:PRT:01:MMS:{07-09} to "VT-50-100-L"

Set as "VT-50-100"

Ask Eric if need to switch to "VT-50-100-L", otherwise Done

Connect DB15F to TT19P cables from feedthrus to portable rack
  • T6/13 to HXM:PRT:01:MMS:07
  • T6/15 to HXM:PRT:01:MMS:08
  • T6/18 to HXM:PRT:01:MMS:09
Done
Connected DB15 vacuum cables from feedthrus to VT-50 stages
  • X stage to T6/13
  • Y stage to T6/15
  • Z stage to T6/18

Test all stages

Tip/Tilt Stages

  • Resources Needed
    • 2 x vacuum cabling
      • Direct connection or
      • DB9 vacuum cables + gender changers
    • 2 x DB9F - TT19P air cables
    • 2 x DB9 Feedthrus
  • Connections
    • Tip MP-20 to TBD FF to HXM:PRT:01:MMS:10
    • Tilt MP-20 to TBD FF to HXM:PRT:01:MMS:11
  • pmgr: MP-20 w or w/o limits?
  • Tasks
ItemCommentsStatus

Select 2 DB9 feedthrus for Tip and Tilt stages

Feedthrus

  • Tip - T6/1
  • Tilt - T6/2
Done

Set pmgr config for HXM:PRT:01:MMS:{10,11} to "MP-20" or "MP-20 w/ Limits".

Set as "MP-20"

May need to switch to "MP-20 w/ Limits"
Connect DB9F to TT19P cables from feedthrus to portable rack
  • T6/1 to HXM:PRT:01:MMS:10
  • T6/2 to HXM:PRT:01:MMS:11

Connects stages to feedthrus

If possible use direct connections from stages to feedthru, or else need DB9 vacuum cables with gender changers


Test all stages


Beam Stop

Zyla #2


ItemCommentsStatus

Find and connect blue USB cable to Zyla

Eric

Connect blue USB cable to USB extender

We will use one of the other USB extenders that are connected to daq-mec-cam05. Running two Zylas on the same host (daq-mec-cam03) will cause operational difficulties.

The MEC daq-config has been updated accordingly.


Find and connect trigger cable to Zyla

Eric


Add a T connector to the end of the green BNC and attach both Zyla triggers to it.
T connection added, waiting on second camera trigger cable.

Verify that other end of green BNC goes to a single connection on PR-60 patch panel.

It goes to #0, all good.

Done
Verify operation in DAQ

Optique Peter (in-air)

ItemCommentsStatus

Set pmgr config for HXM:PRT:01:MMS:12 to "Optique Peter Focus"

 

Done

Connect focus stage using focus cable to HXM:PRT:01:MMS:12.

Need IMS motor extension cable. Vincent says there are some in the XRT, which is open on Tuesday

Remove MSCABLE-3 from XPS2 #7 or #8 - XTCS connection

Look at flange B5, and then remove for use here.

Connected to two rightmost ports on Newport patch panel to left of JJ Slit PLC.


Connect Vertical stage (UTS100) via MSCABLE-3 to MEC:PPL:MMN:28 (XPS4) 

 


Test all stages


Alignment System

DONE Alvium camera for alignment in chamber

  • Resources Needed
    • None (Reuse the front illumination camera, DAQ alias sample)
  • Connections
    • None
  • Tasks: Completed.

Diodes for alignment

Tasks for instrument scientists.

ItemCommentsStatus

Select up to 4 SMW Coaxial feedthrus

See on T5 and T6


Connect feedthrus to channels in the scope under the X-ray optical table

 


Connect diodes to feedthrus using vacuum SMA cables

 



Spare crystal alignment capability

TBD - talk to Eric

ItemCommentsStatus

Determine how many, if any, free channels are available on the PR-60 dumb motor patch panel. If there are none then stop here.

 


Select DB15 feedthrus

 


Set pmgr config for available channels to "VT-50-100-L"

 


Connect DB15F to TT19P cables from feedthrus to PR-60

Connected DB15 vacuum cables from feedthrus to VT-50 stages

Test all stages



  • No labels