This page contains the ITk Inner Pixel Ring/Stave testing Q/C box electrical and readout configurations.
Testing Procedure
- Pre-production testing with QC box: LLS Testing procedure
- Testing LLS with Felix: FELIX Readout for LLS
- Service connectivity for LLS
Testing Results
- pre-production L0 testing results
- Yarr test results: log
B33 Q/C Box/Integration Setup Information
- Q/C box infrastructure: CO2 cooling plant, Q/C box operations
- DAQ Readout Systems: Link Aggregator, RCE, YARR, FELIX, Optobox
- Online infrastructure: ITk DAQ network, DCS monitoring, Interlock, DCS and interlock for LLS
- Electrical designs:
- OSU Altium design repository (All IS electronics design. Ask Steven Welch for access.)
- Confluence TID electronics design repo: Data Transmission, DAQ readout, PCB ID/fab list
- Lessons learned in 19-x designs
- B33 Setup GoogleSheets (System Test setup tasks, Rack plan...)
ITk Pixel Electrical Service General Documentation
- Modules: Module Q/C Portal, ITk Pixel Module Twiki
- On-Detector service FDR
- ITk Pixel Service Specification document (AT2-IP-EP-0007)
- ITk Pixel connectivity spreadsheet for electrical services (AT2-IP-ES-0016)
- Pixel Inner System Electrical Service Summary
- MOPS FDR/PRR
Intro material for onboarding:
Silicon sensor lecture : https://drive.google.com/drive/folders/1Pu1-x6jB4QxNglKGF6yzDNMRiK5EgB3o
Module QC workshop January 2025 : https://indico.physics.lbl.gov/event/3021/timetable/#20250113.detailed
DAQ for the ITK Pixel Upgrade 2024 (Good overall intro): https://indico.cern.ch/event/1389137/contributions/5840294/attachments/2815738/4915494/DAQ_ITk_BBullard_March8-2024.pdf
Module Development for the ATLAS ITK Pixel Detector 2023: https://indico.tlabs.ac.za/event/112/contributions/3234/attachments/1164/1575/TIPP2023_202309.pdf
Loaded Local Support Testing ITK Week 05/12/2025
Old: Prototype testing with RD53A
Electrical Service/Readout Setup
- 19-2 RD53A Coupled RIng Prototype
- 19-2 RD53A L1, L0 Stave Prototypes
- (Pre)Prod system
Checklist for QC Box Testing
- check list (log the relative information also in the checklist while testing)
5 Comments
Prajita Bhattarai
Apr 28, 2025Can we please organize the testing results on this page similar to the electrical service/readout? Prototype, preProd, prod? Also, why is the electrical service/readout setup for L1, L0 stave missing?
Zheng, Zhi
Apr 28, 2025These are old RD53A materials. I think we can simply archive those sections.
Only the first two parts contain useful information for schematics and setups.
Spellman, Alic Shen
Apr 29, 2025Suggest maybe putting the Testing Procedure section at the very top?
Zheng, Zhi
Apr 29, 2025Yes :)
Prajita Bhattarai
Apr 29, 2025Hi Zheng, Zhi this looks great, only one comment, I think this is all for old prototypes right? Can we make a new page & move this entire section and link that to the text
Old: Prototype testing with RD53A?