Agenda for SEECS/SLAC meeting January 20th 2011.

Bold face, topics for coming meeting that we need to address

Future

Pakistani case study - Zafar, Anjum

ICFA Report

PingER

Visualization pinger map - Faisal
  1. Colors for connected links
  2. Range and Colors configuration
  3. Layout revamp to provide more space for map

TULIP

PerfSONAR

Problems were fixed. NTP servers were causing considerable clock delay. Added close-by Stratum 1 NTP servers to solve the problem. Nodes were updated to PerfSONAR version 3.2 (Fedora distro). Nodes however are offline since they were disrupting normal traffic. We are waiting for 10 Mbps dedicated connection to switch the nodes back on.

  1. Faisal is working with Yee.
    1. Arrows for tracerouts being implemented by Faisal.
    2. Working with Yee to get Lat long of perfSONAR host corrected.
  2. Zafar - deploy PerfSONAR nodes at SEECS. Second step is to find whether the same can be done at HEC on PERN's network. It is working, congratulations!
  3. Internet2 Joint Techs meeting at the end of Jan. Can Pak PerfSONAR nodes be up by then?

Possible projects

See [https://confluence.slac.stanford.edu/display/IEPM/Future+Projects]. Zafar will talk to the students about these projects.

  1. Extend the NODEDETAILS data base to allow entry support for whether the host is currenty pingable. 
  2. Extend Checkdata to provide emails automatically, see [https://confluence.slac.stanford.edu/display/IEPM/Extend+checkdata+to+make+it+more+useful]. Many of the ideas in the script node-contacts.pl are a step in this direction.
  3. Add MOS and alpha to pingtable.pl see [https://confluence.slac.stanford.edu/display/IEPM/Add+Mean+Opinion+Score+%28MOS%29+to+pingtable.pl+metrics]  Sadia will start work on it when done with HEC report,  writing thesis. Sadia and Zafar are looking at this. It requires cahnges to pingtable.pl and analyzs*.pl scripts.
  4. Improve the PingER2 installation procedures to make it more robust. This might be something for the person(s) in Pakistan who are responsible for installing PingER2 at the Pakistani monitoring sites. They probably have found where the failures occurs. Also look at the FAQ, and ping_data.pl which has been improved to assist in debugging, could it be further improved (e.g. provide access to the httpd.conf file so one can see if it properly configured)? There are 2 students working on the PingER archive. *Is this something they could work on?*
  5. Fix PingER archiving/analysis package to be IPv6 conformant|display/IEPM/Make+PingER+IPV6+compliant\. Will build a proposal for an IPv6 testbed. They will try various transition techniques. A proposal has been prepared and that has been submitted to PTA. Adnan is a co PI. It is being evaluated today.  A small testbed has been established in SEECS and the plan to shift some of the network to IPv6. Bilal is part of 3 students involved with PingER and they will be involved with IPv6. They are porting the PingER archive site site to using a database. They have redeveloped the archive site using Umar's documentation. They have set up a small test archive site. They have gathering, archiving, analysis. They will design a new database. They will also try a port of PingER to IPv6. 
  6. Look at RRD event detection based on thresholds and how to extend, maybe adding plateau algorithm. Umar's algorithm did  not work in a predictable manner.

Paper - Umar, Fida, Zafar

  1. SVN for paper, Umar has set it up and it is working. Umar will send out the accounts. Not critical at the moment.
  2. Umar will take as the main/first author of the paper. Ali Khayam has put together an introduction
    identifying the main points. Umar will send in the first draft and put together with feedback from Ali. Umar hopes to be done by Mid December. Umar is currently overwhelmed. Zero progress 11/10/2011. Umar has to submit a camera ready copy in the next couple of days.
  3. Adnan is also interested in working on the paper and will talk to Umar.
  4. Umar sent draft to Adnan. Umar will be in Pakistan later this month and will get together with Adnan. Fida will be available after December 16th.
  5. Fida will send review comment to Adnan
  6. Meeting between Adnan, Umar, Ali Khayam did not come to pass due to Adnan being sick. It is believed we need a re-write, the technical details are OK. Adnan will get to more rigorously.

AOB

Future meeting time - Les

The next meeting in Wednesday 26th January 2011 for people in US and 27th January for people in Pakistan.