h1. Toroid Electronics Meeting Minutes
h1. June 26, 2006
h1. Analog Electronics Design
^
h2. Contents
{maketoc}^
h1. Attendees:
| John Dusatko  | Mike Browne | Michael Cecere |
| Steve Smith | Hamid Shoaee | Sheng Peng |

h1. Agenda:
# Analog Electronics

h1. Presentation Materials:
[PPT for meeting, June 19, M. Cecere|http://lcls-dev:4298/tiki-download_wiki_attachment.php?attId=53]

[Project Timeline, M. Cecere|http://lcls-dev:4298/tiki-download_wiki_attachment.php?attId=54]

h1. Minutes:
* Toroid Manufacture Status
** Tim says ceramic, brazed toroids should be here next week for testing
** Toroid coil polarity not resolved yet, will pursue with ISA, with Steve's help

* Will our system be fast enough for IM01, 120Hz Laser Feedback?
** won't be implemented for a while, first operation at 1 - 30 Hz

* Since using only 4 channels of each 16 channel IP330, may as well drive more signals
** i.e. PS status (so IOC knows the toroid box is still alive)
** add another DAC/buffers

* Signal IOC when all 4 channels are ready for IOC ADC to convert
** this should optimize time performance of system
** should be trigger line on cable to IP330.
** drive directly from PIC (with buffer? or just use DAC channel since already buffered)
** Change IOC connector to SCSI to match other end. (straight-through, John?)

* Analog Circuit Design
** Bring Signal Straight to Integrating Op-Amp, no buffer
** Put +/-1 stage immediately after int. op-amp (introduces off-set error, estimate this)
** add buffer circuitry to schematics

* Calibration Circuit Design seems OK

* Use Vern Smith for intra-rack cabling?

* Will Chuck Yee be able to do this job timely? seek other help?

h1. Action Items:
# *M. Cecere:* Adjust circuit as described above
# *M. Cecere:* Need Test Plan
# *M. Cecere:* Add Mechnical Box design to timeline