Summary 

See Robert's Collaboration Meeting talk for more information on these issues.

 Joanne's Notes from the August 1, 2007 Meeting

Screws
-----------
1. Top screw  positions should be adjusted to use design information Robert presented rather than Luis Reyes' measurements. The differences are not large, but we might as well use the best information.
2. We might want to adjust the size of the hole as simulated to account for lessened efficiency around the actual hole. [Current value for hole diameter in the model is 3.2 mm; diameter of screw is 2.8 mm]. If so, someone will need to do some analysis to determine a reasonable value, then pass it on to me.
3. Putting side screws into the model is not as high priority as the other items. It will take some effort to obtain realistic offsets from drawings.

Side shingling
----------------
The fake shingling (tested and ready to go, but not yet used in production jobs) is adequate for MC but not for analyzing real data; substantial lead time is required for analysis using the new geometry to be checked out and optimized. We need to have something more realistic in place in time for the big background run coming up, even if it causes a modest (~week) delay.

In the true geometry side tiles in rows 1 and 2 are tilted and, to lessen gaps at the edges where side faces come together, some of them are trapezoids  (in dimensions perp. to thickness).  Both the tilting and the non-standard shape present problems for various layers of software, impacting Eric C. and me.

For analysis it is most important to get the tilting in, so that tile positions are realistic.  If the tilted tiles are all boxes with orthogonal faces there will be larger-than-actual gaps but the effect will not be large in relative terms and will be in the right direction (making simulated instrument worse than the real one).
Hence the plan is to start with the tilting with the expectation that it, at least, should be ready in time for the big background run.

And also this note from Richard:
"You might mention that Robert is, I think, investigating the ribbons' efficiency mismatch between MC and data."