The following supply list and step by step guide will vary based on individual BIO specs and serves only as a general guideline.

General Supply List

Step-by-step guide

  1. BIO Approval
  2. Drill anchors
  3. Epoxy anchors (typically BIO present) & let cure for time needed
  4. Move base plate into place & insert set screws
    1. Cover up ground facing holes with painters tape if necessary to prevent grout filling
  5. Call alignment to set position of plate
  6. Fabricate aluminum side plates
  7. Caulk to sides of base plate & aluminum tape corners
  8. Cover top of base plate to prevent grout spillage
  9. Mix grout
  10. Pour grout & let cure for time needed
  11. Torque down anchors (typically BIO present)
  12. Done

______________________________________

PREP/PRE WORK/XTRA NOTES

WORK

  1. Bio approval
  2. Alignment to mark holes
    1. Before drilling I like to put the plate in place to make sure holes line up. I’ve had to throw the plate over to the machine shop because of  any odd reason (plate holes are not big enough, technician was just a bit off for drilling into the ground, drawings different that manufactured plate, etc.)
  3. Drill anchors
  4. Epoxy anchors (typically BIO needs to be present pending what type/size of holes) & let cure (typically 24 hours)
    1. There is a special template/form/email to send to them to schedule this
  5. Move plate into place & insert set screws
  6. Call alignment to set position of plate (vertical positioning to beam line & they will adjust set screws)
  7. Fabricate aluminum side plates, caulk into place & aluminum tape corners
  8. Cover top of base plate to prevent grout spillage
  9. Coat anchor bolts with anti-seize & insert into holes
    1. Prevents grout from entering holes/getting stuck to bolts
  10. Mix grout (great to have at least 2 techs for this – 1 to mix 1 to pour, especially for larger plates
  11. Pour grout into funnels & use thumper to help grout move
  12. Let cure for time needed
  13. Remove bolts & clean off
  14. Reinsert bolts & torque down anchors (BIO present again)
  15. DONE





Individuals with the most experienced and can be referenced for knowledge are abc.