Name | MAD Name | EPICS PV | Camera Type | Lens | Position 1 | Position 2 | Position 3 | Position 4 | Position 5 |
---|---|---|---|---|---|---|---|---|---|
PMON | PROF:LI20:45 | PROF:LI20:45 | Manta 125 | Computar 55 | Phosphor | ||||
SYAG | PROF:LI20:2432 | CAMR:LI20:100 | Manta 125 | Nikkor 105 | YAG w/ITO | Phosphor | |||
USTHz | OTRS:LI20:3070 | CAMR:LI20:101 | Mako 125 | Nikkor 105 | YAG | Ti disc | Ti foil | Ti foil | |
USOTR | OTRS:LI20:3158 | CAMR:LI20:102 | Mako 125 | Nikkor 60 | YAG | Ti disc | Ti foil | Ti foil | Ti foil |
IPOTR1 | OTRS:LI20:3180 | CAMR:LI20:103 | Manta 125 | Tokina 100 | Ti disc | ||||
IPOTR1P | CAMR:LI20:104 | ||||||||
IPOTR2 | CAMR:LI20:105 | Ti foil | YAG | ||||||
DSOTR | OTRS:LI20:3206 | CAMR:LI20:106 | Manta 125 | Nikkor 105 | Ti flat | YAG | |||
WDSOTR | OTRS:LI20:3230 | CAMR:LI20:107 | Manta 95 | Tokina 100 | Ti flat | ||||
DTOTR2 | CAMR:LI20:300 | Manta 125 | Computar 55 | YAG | Ti flat | ||||
LFOV | ? | Manta 125 | Nikkor 50 | DRZ | |||||
PRDMP | PROF:LI20:3475 | CAMR:LI20:108 | Manta 95 | Nikkor 35-70 | Phosphor |
USTHz checked out but there is an issue with not having mechanical limit switches. Soft limits need to be used instead and checked before moving. For the short term, best to ask an expert to verify it is set up properly (C. Clarke, J. Allen, S. Gessner). Negative motion is okay when watching with the camera but real caution needs to be used with positive motion.
USOTR currently way zoomed out. Acting as "light detector".
LED light is set up on the IPOTR channel accessible on the profile monitor EDM panel but the blue LED doesn't illuminate the target very well and will be improved.
Working, no notes of note.
DSOTR
Working, no notes of note.
Working, no notes of note.
User control only please... This is on MC01 Ch7 (X) and Ch8 (Y). DTOTR_x: Position 0 is out and 98 is in. DTOTR_y: 108 is YAG. CAMR:LI20:105.
User control only please... This is on MC01 Ch6. Position >100 is out and 0 is in. ND 2.00 filter is on a flipper controlled by the Beckhoff Digital IO, channel 21, output 1 (Binary 5V Out) - APC:LI20:EX02:5VOUT_1. Value "ON" = filter in.
Camera is a CMOS only readable right now in B244...
This is a fixed phosphor screen, no mover.
Fully checked out. Routinely left with the bypass line in the beam path unless E-300 has beam time.
Checked out motion controls. PMT3350 and PMT3360 online but likely need to be timed into beam. See Fig 6 of this paper for a photo of the wirescanner card: https://slac.stanford.edu/pubs/slacpubs/16250/slac-pub-16410.pdf
and also this image: https://drive.google.com/file/d/1p0GmxaqgvbNhOM8emSWSLWk186gSE2lc/view?usp=sharing
Checked out motion controls. For an unobstructed position, 20 mm appears to be an okay on motor, 28 mm on LVDT. But it actually looks to me from the drawings that it ought to be about 90 mm. PMT3350 and PMT3360 online and likely need to be timed into beam
Note, images of the card can be found here: https://drive.google.com/file/d/1scVopR61fpoo_dhtIH5aFozV2wHd0yiM/view?usp=sharing
Tunnel work complete- toroids are connected to long haul cables. Understood to be brought online and calibrated.
Motion control is all good. Cables are prepared for the camera. Just don't have cameras on these yet as they are not needed and we don't want to irradiate cameras without reason. IPOTR1P is on OTRS:LI20:3175.