The Jan/2016 test beam sessions were used to commissioning the DUT readout integration with there newly installed CALADIUM EUDET telescope. Two old FE-I3 pixel modules from the dissembled old cosmic telescope are used as the DUT. The initial readout system was still the Gen-1 RCE and old HSIO as used for 2014. 

Detector Configuration

DUT namemodule IDHSIO linkPosition
C3M51273712Back, vertical
C4M51285511Front, horizontal

Sensor positions (mm). Beam from left to right. Blue planes are EUDET telescope. ATLAS pixel module are red DUT above. C4 can be seen in picture on the right.

Left diagram: only drew C4 DUT, while C3 DUT is behind the Al plate to the right. 

Right picture:

  • Top DUT stage has the PP0 box with HV.
  • Middle shelf has L->R: DVDD PSU (2.1V); AVDD PSU (1.9V) and HSIO.
  • Bottom shelf: 12V PSU for PP0 box HV.

PP0 box ground, HSIO ground strap are tied together to the AVDD PSU ground.

DAQ Configuration

Event Log

Test Runs and Results

Run typeRunDateRun categoryModulesResultsRemarks
Calibration182Jan/19Threshold scanC3,C4threshold_000182.pdfFirst sensible calibration after settled both C3,C4 to there own calib folder
Calibration183Jan/19Digital scanC3,C4digital_000183.pdf"
Beam134Jan/22 C4 Final benchmark long run with DUT timed in. 20K events. 10.5 GeV electrons at ~ few particles/trigger.