Metrology data

Run 4 Ds1 metrology (added April 13)

Run 4 Ds1 average gain corrections

Run 4 DSD metrology (pre-run) , image

Run 4 XPP metrology (pre-run) , image

Run 5 DSD metrology,image, configuration

Run 5 XPP (solid plate) metrology for Mar 2012: spreadsheet, description

Run 5 XPP low gain calibrations

Run 6 DS2 aka DSD CSPAD V1.2 metrology

Run 7 XPP V1.2 metrology

Run 7 MEC 140k metrology

Run 7 DS1 v1.2 metrology

 

2013-10-09-CSPAD-XPP-Metrology.xlsx

2013-12-10-Quad-MEC-Metrology.xlsx

2013-12-12-CSPAD-CXI-DSD-Metrology.xlsx

2013-12-20-CSPAD-CXI-DS1-Metrology.xlsx

2014-03-19-CSPAD-CXI-DS1-Metrology.xlsx

2 May 2014 Files and comment from Gabriel about recent metrology work:

2014-05-15-CSPAD-CXI-DS1-Metrology.xlsx

2014-05-15-CSPAD-CXI-DS2-Metrology.xlsx

 

27 Oct 2014: Files and comment from Gabriel

2014-08-27-CXI-DS2-Metrology.xlsx

2014-09-24-CXI-DS1-Metrology.xlsx

Attached, the most recent CXI metrology files. These replace the May 2014 versions and should be used for all experiments after September 24, 2014.

Changes in CXI-DS1:

Changes in CXI-DS2:

As always, these excel metrology files are NOT FOR DISTRIBUTION to avoid user confusion. Only Mikhail's curated version should be distributed and used.

 

 

 

References