Detector Engineering
SDI parameters
EMCAL
Test Beam
Engineering Studies
HCAL
Solenoid
Fringe Fileds
Weights and Dimensions Relevant to Transportation
IR wakefields
Forward Region
MDI Engineering
Vibrations Control
"Budgeting and control of the mechanical noise in the International Linear
Collider final focus system", D.Tshilumba, M.Oriunno, C.Collette, T.Markiewcz
Vibration Measurements CMS Detector Hall
Vibration Measurements CMS Platform
Vibration Measurements SLD
ILC Kitakami Site
Fringe Fields
Detector Hall
Radiation Simulations
Bridge Cranes and Road Transports
Gantry 3,600 tons
Gantry 400 tons
Dorman Long Jacking Towers
ILS Site and Push-Pull studies - ARUP (2011)