Minutes of SEECS-SLAC Meeting September 7, 2011.

Upcoming

SEECS has an IPV6 Live IP through cybernet. They are currently testing the compatibility issues of Pinger Node/software on it.The mechanism may start as: Take a new host and set it up as IPV6. Then monitor other hosts on IPV6 like ipv6 google etc. Once data is available then work on how to analyze it and use it. Anjum asks, If we have IPV6 and it tries to monitors IPV4, will that work or there will be some problem with that. Les thinks it will work fine. He suggests that we might first put up a separate copy on a host such that it monitors another IPV6 host  and then check how it monitors IPV4. Anjum is going to ask Joun to configure Pinger node on IPV6. Zafar if available, would be helping Joun in this case.

IP address has been assigned to IPV6 but machine has yet not been set up. IP will be active after 10th September.

SLAC now has an IP project with a project manager just hired. Things may start to happen soon.

Future & Publicity

Pakistani case study - Amber, Anjum

  1. Host count has reached 50 in Pakistan.
  2. HEC is shifting the intercity links on Pern2 (so far intracity links are on Pern 2 while intercity are on PTCL). HEC is expecting to have an analysis on what is the effect on min rtt and other metrics after the links are shifted from PTCL to Pern2. (POP to POP is on PTCL).
  3. Amber keep a track of POP to POP links, additional POP links will be intracity. (intercity POPs and intracity POPs analysis will be carried out for HEC later on).
  4. Amber will prepare a report on intercity analysis of PERN nodes for HEC.

Status of Pakistani PingER hosts

As updated on 9/6/2011.

Responsible person: Joun Muhammad

Node

Status

Comments

pinger.ustb.edu.pk

UP

Pinging by another IP. Data not collected.

monitor.niit.edu.pk

UP

Changing IP. Troubleshooting in progress. Shifting this node to PERN IP in headquarters.

pinger.giki.edu.pk

Down

Troubleshooting in progress.

pnec.seecs.edu.pk

Down

Will be up soon. 

sau.seecs.edu.pk

Down

Network and Power issue.

buitms.seecs.edu.pk

Down

OS crashed, concerned person is on leave, will be up after Eid.

cae.seecs.edu.pk

Down

Will be resolved after Eid.

PingER Management

Farhan has left. Bilal and Ghulam are hired for the next three months.

Zafar, Bilal, Ghulam and Sadia will be having a meeting on traceroute archive site documentation in this week.

PingER traceroute archive site

PingER archive site - FYP (Ghulam, Farhan, Zafar)

Adding MOS and Alpha to pingtable.pl

TULIP

CBG TULIP Integration -- FYP (Bilal)

PerfSONAR (Pakistan)

Possible projects

Future meeting time - Les

  1. Next meeting on Wednesday 21st September at 8:00 pm in US and Thursday 22nd September at 8:00am in Pakistan.