Agenda for SEECS/SLAC meeting June 22, 2011.

Bold face topics are to be addressed in the meeting.

Upcoming

Zafar Gilani is leaving for Pakistan on ?July 1st, 2011.

Future & Publicity

Pakistani case study - Zafar, Anjum

  1. 36 hosts are deployed so far and are aiming to deploy 60 hosts in total in Pakistan. As I understand it SEECS will be responsible for the hosts and their PingER app
  2.  Another 10 nodes are in progress and they would be active in about a month. In about two months, 17 new nodes are expected to be functional.
  3. Amber has updated the spreadsheet of network performance in Pakistan by adding MOS.

Dr. Anjum and his team at SEECS presented the Pinger performance in reference to PERN and POPs to HEC (Anwar Amjad and his team).The meeting was held on Tuesday 7th June 2011. Now they want

Latest PERN network map

Anjum got latest PERN map. Notes from Anjum: The provided map is better than the existing one but its still not complete in information and not immediately useable for our purposes. HEC PERN topology maps have yet not been received. Dr. Anjum is reminding them but no progress yet.

Status of Pakistani PingER hosts

Node

Status    

Comments

pinger-rcp.pern.edu.pk

Down 

Not pingable, under trouble shooting with PERN/HEC. This will take a long time to solve, leave it for 1 month.

pinger.ustb.edu.pk

Down

Not pingable, not accessible. Power issue. Troubleshooting in progress.

monitor.niit.edu.pk

Down

Troubleshooting in progress.

pingerqta.pern.edu.pk

Down

Not pingable, not accessible.Network issue.

pinger.lhr.nu.edu.pk

P Down

Power issue.

pingerjms.pern.edu.pk

P Down

Power issue.

pinger.uob.edu.pk

P Down

Power issue.

aup.seecs.edu.pk

P Down

Power issue.

pinger.uaar.edu.pk

Down

Power issue.

pingermtn.edu.pk

P Down

Power issue.

Responsible people:

PingER managment

PingER traceroute archive site

PingER archive site -- FYP (Ghulam and Farhan)

Pinger New Schema (Zafar and Co.)
Adding MOS and Alpha to pingtable.pl

TULIP

CBG TULIP Integration -- FYP (Bilal)

Best Line Approach CBG-TULIP (Zafar and Bilal):

First thing is the need of landmark sets and their RTT that can be fetched from a DB (They will be designing this DB).

Designing Database:

Schema: one Table having RTT with pair of LandMark in each row.

create table pairs (
  hostName1 varchar(80) default null,
  hostName2 varchar(80) default null,
  continentOf1 varchar(100) default null,
  continentOf2 varchar(100) default null,
  rttFrom1To2 float default null,
  rttFrom2To1 float default null,
  lastUpdateDate timestamp not null
);

Procedure: Pick landmark fromTULIP db. For each landmark

Made a database named bestline with a landmarks table in it. TULIP Code is reformed such that it collects data from reflector.cgi and sites.xml and fills results in landmarks table. The data of this table is updated every time TULIP code is executed for finding a target.

Next Task is to enhance bestline.m so as to read data from table and use it for calculating geographical locations.

IPv6 activities at NUST SEECS, Pakistan

PingER2 works with IPv6, could start taking data and see what breaks. Here is the list of activities we have been doing at the moment:

We are setting up a testbed at SLAC initially it will be isolated from the Internet.

PerfSONAR (Pakistan)

PerfSONAR (USA)

  1. Zafar: Yee will meet Jason in person (at Joint Techs in Alaska in July) to tell him about SNMP-MA extensions. He thinks emailing is not a good idea. :P
  2. Zafar: Currently working on extending FTMA (which is a new PerfSONAR service and currently under developement) to add in support for MySQL.
  3. Faisal is fixing bugs with the new perfSonar mashup that Yee put up.

Possible projects

Future meeting time - Les

The next meeting is Wednesday, June 22nd, 2011 (8 pm) for people in US and Thursday, June 23rd, 2011 (8 am) for people in Pakistan.