June 2011 - 3rd and 4th Quarter FY11 installations - from John Weiskopf

 This will require 13 racks: there are 6 available (without power strips) + 3 in rows. Will need temp power for these racks. Work is underway to buildout 5 water cooled racks on the 1st floor, with capability to expand to 10 with next year money.