The following areas all have Ethernet switches. Each switch has port numbers assigned.
Injection Area at Sector 20
LINAC Sector 21
LINAC Sector 22
LINAC Sector 23
LINAC Sector 24
LINAC Sector 25
LINAC Sector 26
LINAC Sector 27
LINAC Sector 28
LINAC Sector 29
LINAC Sector 30
Building 136
Building 106
Main Control Center (Building 005 - MCC
Building 105
Building 406
Building 911
(SB2.1)
Building 912
(SB2.2)
Building 913
(SB2.3)
Building 921
(SB3.1)
Building 940
(XTOD Front-end Enclosure)
Building 950
(XTOD Near-End Hall)
Building 960
(XTOD X-Ray Tunnel)
Building 999
(XTOD Far-end Hall)