Configuration details:

For L-10011, we should plan for

  • Zyla for alignment purpose
  • 4x epix100a (I checked with Philip Hart, he thinks we have 3 detectors at the hutch, if not 4 we’ll have to unmount the one in the XTCS)
    • one is on the XRTS and remains there,
    • one will be on the users’ spectrometer (arriving soon)
    • 2 are on post holders (I will assemble them tomorrow)
  • Motorization for the target assembly (PLS-85 and hexapod)
  • Motorization for the XRTS (PI XYZ assembly, similar to the off-axis parabola right now)
  • Motorization for the 500mm Zyla long stage


I will schedule the time to work on XTCAV next week. I’ll send you the invite.


  • No labels