Search/Navigation:
Related:
SLAC/EPP/HPS Public
Jefferson Lab/Hall B/HPS Run Wiki
S30XL-LESA/LDMX
L0M09 Hybrid baseline_config Test:
Power supply readings after loading baseline_config_L0.xml
4/4 APVs Synced
(V) | (A)
AVDD: 2.50 | 0.293
DVDD: 2.50 | 0.256
V125: 1.25 | 0.236
FPGA: 5.52 | 1.15
Baseline config run successful.
L0M09 hybrid icalScal:
Successful at 120Hz scan