You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

This page documents the configuration during the 2024 Summer Shutdown.

Notes

This section contains notes on the cables between the NW side of target chamber and rack PR60.

  • Standard Motor DB9 Cable #1
  • Standard Motor DB9 Cable #2
  • Standard Motor DB9 Cable #3
  • Standard Motor DB9 Cable #4
  • Standard Motor DB9 Cable #5
  • Standard Motor DB9 Cable #6

Bottom Flanges

FlangeFeedthruDestination
B1
  • a
  • dest a
B2

B3

B4

B5

B6

B7

B8


Door Flanges

FlangeFeedthruDestination
D1a
  • a
  • dest a
D1b

D2a

D2b

D2c

D2d

D4a

D4b

D5a

D5b

D7a

D7b

D7c


Over-the-Chamber Flanges

FlangeFeedthruDestination
T4/gamma
  • a
  • dest a
T5/beta

T6/alpha

T11/delta



  • No labels