Detector requirements from TXI beam line
- L2SI-GR-0002, Global Requirements Document L2S-I Beam Parameters
- L2SI-PR-0021-R0, NEH 1.2 Instrument Scope Document
ASICs documentation
Transceivers
Detector Design Concept
- Initial design concept revision A (2019) presentation
- Preliminary Concept Design Review 07-23-21 (talk1, talk2 and talk3)
- Mechanical design
- Thermal analyses
- Electronics Design
Grounding
Tile board
- Mother board
- Voltage drop simulation
- 50Gpps board simulation
- Timing ePixHr10k at LCLS-II
Board Design files
Cables
- Fiber optics cable
- MTP24 1:3 breakout cable (link)
Firmware
Software
Meetings
- File with Dionisio's meeting notes (file)
- - Concept design review (talk1, talk2 and talk3)
- - Meeting with the BL scientists (file)
- - Meeting with the BL scientists (file)
- - Meeting with the BL scientists (file)
- - Meeting with the BL scientists (file)
- - Internal Meeting focus on cooling simulation results (file)
- - Meeting with the BL scientists (file)
- - Mechanical status updated and board distribution (no presentation).
- - Tile cooling with simulations from Marco (ppt)
- - Mechanical status updated and board distribution (no presentation).
- - Mechanical status updated and board distribution (no presentation).
- - Status updates and follow up from 04/02 meeting (no file, only meeting notes)
- - Tile cooling and connector discussions (file)
- - Tile cooling and connector discussions (file)
- - Tile cooling and connector discussions (file)
- - Initial electromechanical design concept discussion with beam line group (file)
- - Initial electromechanical design concept discussion (file)
- - Initial electromechanical design concept discussion (file)
- - kick-off meetingFlex boards and wire thickness discussions (ppt)
Data communication protocol
Image definition
Register map