Current Status
Name | MAD Name | EPICS PV | Camera Type | Lens | Position 1 | Position 2 | Position 3 | Position 4 | Position 5 |
---|---|---|---|---|---|---|---|---|---|
PMON | PROF:LI20:45 | PROF:LI20:45 | Manta 125 | Computar 55 | Phosphor | ||||
SYAG | PROF:LI20:2432 | CAMR:LI20:100 | Manta 125 | Nikkor 105 | YAG w/ITO | Phosphor | |||
USTHz | OTRS:LI20:3070 | CAMR:LI20:101 | Mako 125 | Nikkor 105 | YAG | Ti disc | Ti foil | Ti foil | |
USOTR | OTRS:LI20:3158 | CAMR:LI20:102 | Mako 125 | Nikor 60 | YAG | Ti disc | Ti foil | Ti foil | Ti foil |
IPOTR1 | OTRS:LI20:3180 | CAMR:LI20:103 | Manta 125 | Tokina 100 | Ti disc | ||||
DSOTR | OTRS:LI20:3206 | CAMR:LI20:104 | Manta 125 | Nikkor 105 | Ti flat | YAG | |||
WDSOTR | OTRS:LI20:3230 | CAMR:LI20:105 | Manta 95 | Tokina 100 | Ti flat | ||||
DTOTR2 | CAMR:LI20:106 | Manta 125 | Computar 55 | YAG | Ti flat | ||||
LFOV | CAMR:LI20:107 | Manta 125 | Nikkor 50 | DRZ | |||||
PRDMP | CAMR:LI20:108 | Manta 95 | Nikkor 35-70 | Phosphor |
Camera Notes
USTHz
USTHz checked out but there is an issue with not having mechanical limit switches. Soft limits need to be used instead and checked before moving. For the short term, best to ask an expert to verify it is set up properly (C. Clarke, J. Allen, S. Gessner). Negative motion is okay when watching with the camera but real caution needs to be used with positive motion.
USOTR
USOTR currently way zoomed out. Acting as "light detector".
IPOTR1
LED light is set up on the IPOTR channel accessible on the profile monitor EDM panel but the blue LED doesn't illuminate the target very well and will be improved.
DTOTR2
User control only please... This is on MC01 Ch7 (X) and Ch8 (Y). DTOTR_x: Position 0 is out and 98 is in. DTOTR_y: 108 is YAG. CAMR:LI20:105.
LFOV
User control only please... This is on MC01 Ch6. Position >100 is out and 0 is in. CAMR:LI20:107. ND 2.00 filter is on a flipper controlled by the Beckhoff Digital IO, channel 21, output 1 (Binary 5V Out) - APC:LI20:EX02:5VOUT_1. Value "ON" = filter in.
PRDMP (not a user area item but included for completeness)
This is a fixed phosphor screen, no mover. CAMR:LI20:108.
Oven Table Mover
Fully checked out. Left with the bypass line in the beam path.
Work in Progress
Toroids
Tunnel work complete- toroids are connected to long haul cables. Need to be brought online and calibrated.
IP Wirescanner 1
Checked out motion controls. PMT3350 and PMT3360 appear offline but are connected to long-hauls and no signs of why there would be issues from the tunnel side (works now that triggers reconnected?). Work still needed here. See Fig 6 of this paper for a photo of the wirescanner card: https://slac.stanford.edu/pubs/slacpubs/16250/slac-pub-16410.pdf
IP Wirescanner 3
Checked out motion controls but LVDT is not calibrated. For an unobstructed position, 20 mm appears to be an okay on motor, 28 mm on LVDT. But it actually looks to me from the drawings that it ought to be about 90 mm. PMT3350 and PMT3360 appear offline but are connected to long-hauls and no signs of why there would be issues from the tunnel side. Work still needed here.
Note, images of the card can be found here: https://drive.google.com/file/d/1scVopR61fpoo_dhtIH5aFozV2wHd0yiM/view?usp=sharing
IPOTR2 and IPOTR1P
Motion control is all good. Cables are prepared for the cameras. Just don't have cameras on these yet as they are not needed and we don't want to irradiate cameras without reason. IPOTR2 is controlled on OTRS:LI20:3202 and IPOTR1P is on OTRS:LI20:3175.