You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

Agenda

  1. Collaboration Sotware Agenda               — All
  2. Pass 2 status, skims                               — Nathan
  3. Update on MC production                       — Bradley
  4. Recent errors & their resolution              — Luca, All
  5. Madgraph vs. Luca's Generator              — Luca    
  6. (Software Roundtable/Quick check          – Norman, All)
  7. Questions?                                              – All

 Current draft for Software Agenda at Collaboration meeting:


  • Intro/Tasks/Organization                                                                                                              — Maurik
  • Tracking                                  — Update/Overview of the new multi strategy tracking scheme. —  Omar or Sho
  • ECAL                                      — Update on ECAL code and calibrations                                   — Holly or Nathan
  • SVT Alignment                                                                                                                             — Allesandra or Pelle
  • Tracking and Vertexing in 3D B-field                                                                                            — Norman
  • Run Database/ Data Catalog/ Conditions                                                                                     — Jeremy  
  • DQM        — Organizing “offline monitor” shifts?                                                                         — Matt G 

Talk on detector efficiency?
Talk on reducing the event size?

Notes

Not all the steering files work with all the versions of the software. This may be getting confusing (e.g. current trunk cannot run the EngineeringRun2015FullRecon.lcsim but work OK with EngineeringRun2015FullRecon_Pass2.lcsim). We are currently not keeping track of what works with what. How can we do better?

Currently the "HPS-EngRun2015-Nominal-v3" detector model does not have an entry in "Detector Geometry Overview". Do we want to keep this method of documenting the geometries?

 

  • No labels