Search/Navigation:
Related:
SLAC/EPP
/HPS Public
Jefferson Lab/Hall B
/HPS Run Wiki
S30XL-LESA/LDMX
------- HPS SVT Start of Shift Checklist -------- Shifter name: Time and date: Previous Shifter: Hall B beamline shifter: Current run: SVT module power status (ON/OFF): Write down lowest and highest values of AVDD, DVDD and V125 currents, incl. module nr: What is the high voltage value for each module: Check high voltage setting for each module: Check SVT module temperature, write down highest and lowest temperature: ECal status: Trigger status: Pair spectrometer magnet (current and B-field): Accelerator status: Beam current (nA): Beam position X,Y (um): Beam plans for the shift: Notes from previous shifter:
------- HPS SVT Hourly Shift Checklist -------- Current run/status: Time: SVT module power status (ON/OFF): Write down lowest and highest values of AVDD, DVDD and V125 currents, incl. module nr: What is the high voltage value for each module: Check high voltage: Check SVT module temperature, write down highest and lowest temperature: ECal status: Trigger status: Pair spectrometer magnet (current and B-field): Accelerator status: Beam current (nA): Beam position X,Y (um): Beam plans: Notes/comments:
------ HPS SVT Shift Summary Checklist ------- Shifter name: Time and date: Runs taken: ?[Run nr] [Start] [Stop] [Events] [Beam current] [Beam position X] [Beam position Y] [Comments] Next Shifter: Notes/comments: