Search/Navigation:
Related:
SLAC/EPP
/HPS Public
Jefferson Lab/Hall B
/HPS Run Wiki
S30XL-LESA/LDMX
------- HPS SVT Start of Shift Checklist -------- Shifter name: Time and date: Previous Shifter: Hall B beamline shifter: Current run: SVT module power status (ON/OFF): Write down lowest and highest values of AVDD, DVDD, V125 incl. module nr: What is the high voltage value for each module: Check high voltage currents (should be 0 in GUI): Check SVT module temperature, write down highest and lowest temperature: ECal status: Trigger status: Accelerator status: Beam current (nA): Beam width X,Y (um): Beam plans for the shift: Notes from previous shifter:
------- HPS SVT End of Shift Checklist -------- Current run/status: Shifter name: Time and date: Next Shifter: SVT module power status (ON/OFF): Write down lowest and highest values of AVDD, DVDD, V125 incl. module nr: What is the high voltage value for each module: Check high voltage currents (should be 0 in GUI): Check SVT module temperature, write down highest and lowest temperature: ECal status: Trigger status: Accelerator status: Beam current (nA): Beam width X,Y (um): Beam plans for the shift:
Shifter name:
Time and date:
Next Shifter:
Runs taken:
?Run nr Start Stop Events Beam current Beam width Comments