< Back to SharePoint LCLS-II Controls Page
LCLS-II Devices
Device |
Software Lead |
Hardware Lead |
---|---|---|
BPM |
Sonya Hoobler |
Steve Smith |
Profile Monitor |
Qing Yang |
Dave Brown |
Beam Current Monitor (Toroids?) |
Arturo Alarcon |
Brian Bennett/Dave Brown |
Wire Scanner |
Shantha Condamoor |
James Bong |
Collimator |
Shantha Condamoor |
James Bong |
Bunch Compressor |
Shantha Condamoor |
James Bong |
Laser Heater |
Zheqiao Geng |
Joe Frisch |
Undulator Motion Controls |
Arturo Alarcon |
James Bong |
Vacuum |
Matt Boyes/Pelham Keahey |
John O'Neal |
Power Supply (Magnets?) |
Kristi Luchini |
Briant Lam |
Beam Finder Wire |
Arturo Alarcon |
Heinz Dieter-Nuhn |
BLM (MPS) (Beam Loss Monitor) |
Matt Boyes |
Alan Fisher |
BLF (Beam Loss Fiber?) |
Qing Yang |
Alan Fisher |
BLEN (Bunch Length Monitor) |
Qing Yang |
Dan |
Stoppers (Assume PPS) |
Arturo Alarcon |
Enzo |
Temperature Monitoring |
Sonya Hoobler |
Anthony Tilghman |
Tune-Up Dump |
Qing Yang |
Dan |
LLRF (RF?) (Modulators?) |
Kukhee Kim |
Ron Akre |
T-CAV |
Kukhee Kim |
Ron Akre |
Drive Laser |
Zheqiao Geng |
Bill White / Sasha |
Computers, Crates, Modules |
Jingchen Zhou/Sonya Hoobler |
Bob Traller |
Racks |
N/A |
Mario Ortega |
Long Haul Cables |
N/A |
Mike DiSalvo |
Facility Controls |
Susie Zheng/Matt Boyes |
Bill Choate |
LCLS-II Systems (WBS 1.7)
System |
Software Lead |
Hardware Lead |
---|---|---|
PPS |
Arturo Alarcon |
Kristina Turner |
BCS |
Arturo Alarcon |
Brian Bennett |
MPS |
Matt Boyes/ Diane Fairley |
Ken Leung |
Timing |
Kukhee Kim |
John Dusatko |
Networks |
Jingchen Zhou |
Charlie Granieri |
Centralized Computing Infrastructure |
Jingchen Zhou |
|