You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

< Back to SharePoint LCLS-II Controls Page

LCLS-II Devices

Device

Software Lead

Hardware Lead

BPM

Sonya Hoobler

Steve Smith

Profile Monitor

Qing Yang

Dave Brown

Beam Current Monitor

Arturo Alarcon

Brian Bennett/Dave Brown

Wire Scanner

Shantha Condamoor

James Bong

Collimator

Shantha Condamoor

James Bong

Bunch Compressor

Shantha Condamoor

James Bong

Laser Heater

Zheqiao Geng

Joe Frisch

Undulator Motion Controls

Arturo Alarcon

James Bong

Vacuum

Matt Boyes/Pelham Keahey

John O'Neal

Power Supply

Kristi Luchini

Briant Lam

Beam Finder Wire

Arturo Alarcon

Heinz Dieter-Nuhn

BLM (Beam Loss Monitor)

Matt Boyes

Alan Fisher

BLEN (Bunch Length Monitor)

Qing Yang

Joe Frisch

Stoppers

Qing Yang

 

Temperature Monitoring

Sonya Hoobler

Anthony Tilghman

Tune-Up Dump

Qing Yang

 

LLRF

Kukhee Kim

Ron Akre

T-CAV

Kukhee Kim

Ron Akre

Drive Laser

Zheqiao Geng

Bill White

Computers, Crates, Modules

Jingchen Zhou/Sonya Hoobler

Bob Traller

Racks

N/A

Mario Ortega

Long Haul Cables

N/A

Mike DiSalvo

Facility Controls

Susie Zheng/Matt Boyes

Bill Choate

LCLS-II Systems (WBS 1.7)

System

Software Lead

Hardware Lead

PPS

Arturo Alarcon

Kristina Turner

BCS

Arturo Alarcon

Brian Bennett

MPS

Matt Boyes/Dayle Kotturi

Ken Leung

Timing

Kukhee Kim

John Dusatko

Networks

Jingchen Zhou/Sonya Hoobler

Charlie Granieri

Centralized Computing Infrastructure

Jingchen Zhou

 

  • No labels