  • Les has postponed his trip since DoE will not give approval given the recent tragic event in Lahore.
  • The draft letters of invitation for Sadia and Amber are with SLAC's international services. I have given expected dates of arrival, phone # and email addresses to SLAC international office*. Current plan is for arrival April 1st.*
  • Sadia, Amber and Bilal have their SLAC computer and Wiki accounts. Amber had a problem with her Windows password. Is this fixed?When the new conluence comes into operation on 13 Feb then she should be OK.
  • Zafar received his DS-2019 on Dec 10 (Fri). Applied for visa on Dec 13 (Mon). Interview date was Jan 3, it has been delayed to 24 Jan. Visa accepted now await clearance. Expect ~2 weeks. Hope start march.

...

  • Pakistani case study is done for the moment.
    • A summary of the case study is in the ICFA report.
  • UETTaxila Zafar
    • Zafar has started taking and archiving traceroutes between Pakistani monitoring hosts on a daily bases.
    • Information on the events at Taxila has been added, we await a stable time to analyze the measurements for
    Amber will need to get up to speed on Linux
    • They have been switching providers from NTC to PTCL (commercial), now with HEC. The switching equipment at the vendor end is poor. UET was asked to purchase the switching equipment and put it into vendor node. During daytime until 3:30pm when the classes are on, internet access is blocked to the hostels. After 3:30pm it is enabled thus RTT increases.
  • Sadia is working on prm.pl to add alpha and MOS. She has a local copy, when done will update on the server. How is it going?She is having problems getting prm.pl to call createpage.pl

ICFA Report

  • The ICFA report has been submitted - Zafar
  • Zafar is working with Les on a case study for Egypt. Services have now been restored so we have more information to add. Umar suggested posting the study when ready on SlashDot. *. Did Zafar did this get done?*

PingER

  • The traceroute server at Pune has moved to a new host.
  • We are working on getting pinger2.pl working at Sarawak. The pinger.xml page needs to be fixed
  • PingER archive site: Ghulam and Farhan  have  created two ERDs. One is a simple design (relatively inefficient) and another is a complex design (relatively efficient though it might introduce some redundancy) with multiple normalized tables that can be joined. They have created MySQL databases following both ERDs and have done some stress testing. The simple design is faster to load, the more complex design is faster to load data from. They will probably go with the more complex design. Update. Umar went through the URDs, and requested a document on what they have done. 

TULIP

  • With the move to the new host Faisal had to get a new cookie to allow scriptroute to run scripts on the PlanetLab infrastructure. Still needs testing.
  • Get the MatLab license at SEECS and put up a CGB server using it. Do not have license for MatLab will do on own machines to test and will migrate when have license. Zafar will contact Arshad and Ali. Basically the client will call the reflector with the target. The reflector will return the landmarks and RTTs. The client will then call the CBG/MatLab server with the relevant RTTs, lat/longs etc. Update
  • CBG Bilal went to home time after exams, so far changed CBG to integrate into TULIP. Hoped to get to him by end of last week, when he returns meet on Monday. Update

...

The next meeting in Wednesday February 11th 16th 2011 for people in US and 27th January for people in Pakistan.