  • Cross check the placement of the tiles and ribbons against the integration testing position maps.
    When will data be available? And in Eric should have this data available soon if not already. In what form? It is fairly easy to dump the details of the ACD geometry from the simulation.
  • Update Blanket/MMS
    Dave Thompson has provided the final numbers in a PDF file.
    Currently the blanket/MMS is simulated as a single layer of cooked up material . Do we desire a more accurate representation? The cost being multiple layers to propagate through in the simulation.as setup back for the AO. Joanne and Heather will be updating the dimensions and material to conform to the new values. What is the crown?
  • Screws
    Typical tiles have four iron screws each, the bottom row large tiles have 20 (I think). Much work went into this before DC2. However, there were problems in how the volumes associated with the screws were handled by the simulation. Joanne has volunteered to address this again and basically start from scratch.
  • Shingling
    Work on this has not yet been scheduled.
  • No plans for modeling flexures, BEA, or updating the simulation of the support material.

...

  • Ribbon Attenuation
    Alex has provide provided mean PE per MIP for an average ribbon at various positions.

...