Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

2009

Introduction

This INCITE project started in 2008 with 4.5 million hours. In 2009 we were awarded 8,000,000 Processor Hours on Cray XTs at Oak Ridge National Laboratory to carry out the simulations for possible future linear colliders such as International Linear Collider and Compact Linear Collider.

...

  1. The following is a snapshot of the electric fields in a coupled PETS and accelerating structures in two-beam module for Compact Linear Collider (CLIC). A more detailed studies are in the process.
  2. PETS.mov movie for the wakefield study of the Power Extraction and Transfer Structure (PETS) in CLIC.
  3. A choke.mov movie for optimizing a Choke cavity (high-gradient concept).
  4. here is the link to a movie of the coupled PETS and a accelerating structure in MovieCoupledOutro.mov.

2010

Reports

Highlights

PEPX Undulator Taper

PEPX Wiggler Taper

ERL Vacuum Chamber

480p movie
720p movie
1080p movie

Related Publications

...

If you need more information, please contact Lie-Quan Lee by email at liequan@slac.stanford.edu or by phone at 650-926-5356.