ComponentItemUseStagePVsCommentsNew Cabling  ResourcesFeedthru
SPL Ref laserBoth1 X IMSMEC:USR:MMS:19From Rocca
T5/5 DB15
FilterBoth1 X IMSMEC:USR:MMS:21

From Rooca

No longed needed due to MPA1 work.


N/A

Power meterBoth1 X IMSMEC:USR:MMS:23From Rocca
T5/2 DB15
Vacuum risBoth
MEC:USR:MMS:20From Rocca
T5/#4 DB9
M5 TipBoth1 X NewportMEC:PPL:MMN:09From Rocca
B7/H1 DB25
M5 TiltBoth1 X NewportMEC:PPL:MMN:11From Rocca
B7/H3 DB25
Optique Peter

Focus

Both

1 X IMS

MEC:USR:MMS:21

In air stage


N/A

Large translation

Both

1 x Newport

MEC:PPL:MMN:23

In air stage


N/A

Focusing Optics

OAP

Both

3 X IMS

MEC:TC1:MMS:14

MEC:TC1:MMS:15

MEC:TC1:MMS:16

From Rocca

Off-axis parabola in the GUI


B1?? DB50

MXI500mmBoth1 X IMSMEC:TC1:MMS:22From Rocca
B5/B6 DB25
small hexapodBoth1 X HexapodMEC:HEX:03From Rocca
Hex
Filter WheelAFW-65Both1 X IMSMEC:USR:MMS:27From Rocca
T5/#1 DB9 
schlieren imaging2 x MFA 25 mmBoth2 X Newport

MEC:PPL:MMN:17

MEC:PPL:MMN:18

Both

MFA


?? DB25

?? DB25

1 x UTS150Both1 x NewportMEC:PPL:MMN:22

UTS


?? DB15
TSO optionHor LTAGaltier1 X NewportMEC:PPL:MMN:20installed
?? DB25
Focus LTAGaltier1 X NewportMEC:PPL:MMN:21installed
?? DB25
Ver UTS150Galtier1 X NewportMEC:PPL:MMN:19installed
?? DB15
Talbot gratingUTS100 XNick1 X NewportTBDin airto addN/A
UTS100 ZNick1 X NewportTBDin airto addN/A

PL65 Vertical

PLS-85??

Nick1 X IMS

Planned:

  • TBD - whatever is free on PR-60 (high priority)

pmgr:

  • PLS-85??
in airto addN/A
alviumsNF/FFBoth1 X AlviumDAQ onlyFrom Rocca
N/A
TimetoolBoth1 X AlviumDAQ onlyFrom Rocca
N/A
spl_spot Both1 X AlviumDAQ onlyFrom Rocca
N/A

Second Downstream detector




ImagerGaltier1 X Andor ZylaDAQ only

Need:

  • USB cable
  • trigger 
to connect on the DAQ

Y

Galtier 1 X NewportTBDUTS100

1 x MSCABLE

N/A

optique peter focus

Galtier1 X IMS

Planned:

  • HXM:PRT:01:MMS:12

pmgr:

  • Optique Peter Focus
TBD

1 x DB25 F? - TT19P

N/A

grating

installed in the XRT HRM1 instead of the Be CRLSi mirror


GaltierNoneN/ANo ECS work required. N/A
Crystal assembly6 x XGaltierNoneN/AUMR - manual stage, no work
N/A
6 x YGaltier6 X IMS

Planned:

  • HXM:PRT:01:MMS:01 
  • HXM:PRT:01:MMS:02
  • HXM:PRT:01:MMS:03
  • HXM:PRT:01:MMS:04
  • HXM:PRT:01:MMS:05
  • HXM:PRT:01:MMS:06

pmgr:

  • all VT-50-100-L
VT50L

6 x DB15 F-F  Passthru vacuum cables

6 x DB15 F - TT19P air cables

6 X TBD DB15

6 x ZGaltier6 X NewportTBDMFA, asking CXI if they can lend us a spare MFA

6 x DB25 F-F vac

6 x MMCABLE

6 x TBD DB25

6 x RotationGaltierno motor control - but  6 feedthrus.N/APR-50, MMC-100 and PC control, no ECS work

6 x PR-50 Vacuum Motor Cable (Female Dsub 9 Pin, 1.5m) 

6 x Atmospheric Motor Cable (Female to Male Dsub 9 Pin, 1.5m)

6 X TBD DB9

5 x chi motionGaltierNoneN/A561-GON - manual stage
N/A
1 x chi motorizedGaltier1 x smaractTBD
  • we have the feedthrough
  • we have the in air (likely) and the controller
  • from XPP

B8/TBD  DB15

Small hexapod

stack of 25 lenses of 50 mic radius of curvature


Galtier1 x HexapodMEC:HEX:02


Replacement for small hexapod





XYZGaltier3 x IMS

Planned:

  • HXM:PRT:01:MMS:07
  • HXM:PRT:01:MMS:08
  • HXM:PRT:01:MMS:09

pmgr:

  • all VT-50-100-L
need to check in air, check flange of in vacuum IMS

3 x VT50 vac

3 x VT50 air

3 x TBD DB15
Tip/TiltGaltier2x IMS

Planned:

  • HXM:PRT:01:MMS:10
  • HXM:PRT:01:MMS:11

pmgr:

  • MP-20 or "MP-20 w/Limits"
need to check in air

2 x MP-20 vac

2 x MP-20 air

2 x TBD DB9

Spare crystal alignment capability

1-2 x translationGaltier2 x IMS

Planned:

  • TBD - whatever is free on PR-60

pmgr:

  • all VT-50-100-L


VT50/VT50Lget spare in air2 x TBD DB15

Alvium camera for alignment in chamber

1 x whatever formatGaltier-DAQ onlyreuse the front illumination camera, DAQ alias sample

Diodes for alignment

max 4 (could have up to 6)Galtierin vac sma cablesN/A4 channels in the scope under the X-ray optical tablepotentially new sma vac cable neededSMA

...